mpRes » League » [MRc] RX Championship » 2021 » Round 02 Qualifying 1de | en

[MRc] RX Championship Season 2021 - Round 02 Qualifying 1 (replay) download
Version LfS 0.6V FXR AS1
Time 28.03.2021, 12:34:15
Distance 3 Laps (5.61 km)
Daytime Afternoon
Weather Cloudy
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
4 of 4 cars finished the race.
1 (+1) 11 | TimDC 3 3:03.58 0 - 57.62 1 (3) X X W
2 (+2) 25 RJ 3 + 1.66 0 - 58.75 0 X W
3 (±0) 23 J.Dohnalík 3 + 2.65 + 0.99 0 - 59.18 2 (1-2) X X W
4 (-3) ^h3 •‹FLYING ET 3 + 3.78 + 1.13 0 - 1:00.40 0 X X W

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
^h3 •‹FLYING ET 1:02.45 107.77 3 2.75
23 J.Dohnalík 1:02.08 108.43 3 2.90
25 RJ 1:01.75 109.01 3 3.84
11 | TimDC 1:01.19 109.99 3 4.54

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 57.05
11 | TimDC 30.27 0.06 3 26.84 --- 2 57.11 0.51 57.62 --- 3
25 RJ 30.21 --- 3 28.03 1.19 2 58.24 0.51 58.75 1.13 3
23 J.Dohnalík 31.12 0.91 2 28.06 1.22 2 59.18 --- 59.18 1.56 2
^h3 •‹FLYING ET 31.17 0.96 3 29.19 2.35 2 1:00.36 0.04 1:00.40 2.78 3

Flags

Name Yellows Caused Blues Seen
2 cars caused 3 yellow and 0 cars got 0 blue flags.
11 | TimDC 1 0
23 J.Dohnalík 2 0

Lap by Lap Analysis

Lap 11 | TimDC 25 RJ 23 J.Dohnalík ^h3 •‹FLYING ET
Player Graph Player Graph Player Graph Player Graph
Total 3:03.58 3:05.24 3:06.23 3:07.36
+ 1.66 + 2.65 + 3.78
100%: 57.62 101%: 58.20 103%: 59.35 105%: 1:00.50 107%: 1:01.65 >107%: >1:01.65 Pitstop Takeover Penalty Lap Rejoin
1 1:07.57 1:07.14 1:05.06 1:06.35
2 58.39 59.35 59.18 1:00.61
3 57.62 58.75 1:01.99 1:00.40

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)