mpRes » League » [MRc] RX Championship » 2021 » Round 03 Qualifying 5de | en

[MRc] RX Championship Season 2021 - Round 03 Qualifying 5 (replay) download
Version LfS 0.6V FXR BL3
Time 11.04.2021, 12:54:05
Distance 4 Laps (7.35 km)
Daytime Day
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
5 of 5 cars finished the race.
1 (±0) 11 | TimDC 4 4:00.75 0 - 57.55 4 (1-4) X X W
2 (±0) 25 RJ 4 + 2.09 0 - 58.28 0 W
3 (+2) 27 | RedBoT 4 + 5.41 + 3.32 0 - 58.13 0 X M
4 (-1) ^h3 •‹FLYING ET 4 + 11.12 + 5.71 0 - 58.39 0 X X W
5 (-1) 616 Jam 4 + 11.56 + 0.44 0 - 59.51 0 X W

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
11 | TimDC 1:00.19 109.91 4 2.53
25 RJ 1:00.71 108.97 4 2.78
616 Jam 1:03.08 104.88 4 3.57
27 | RedBoT 1:01.54 107.50 4 3.58
^h3 •‹FLYING ET 1:02.97 105.06 4 4.75

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 57.46
11 | TimDC 30.72 --- 3 26.83 0.09 3 57.55 --- 57.55 --- 3
27 | RedBoT 31.36 0.64 2 26.74 --- 3 58.10 0.03 58.13 0.58 3
25 RJ 30.98 0.26 4 27.07 0.33 2 58.05 0.23 58.28 0.73 3
^h3 •‹FLYING ET 31.17 0.45 3 27.22 0.48 3 58.39 --- 58.39 0.84 3
616 Jam 31.75 1.03 2 27.52 0.78 3 59.27 0.24 59.51 1.96 3

Flags

Name Yellows Caused Blues Seen
3 cars caused 3 yellow and 0 cars got 0 blue flags.
27 | RedBoT 1 0
^h3 •‹FLYING ET 1 0
616 Jam 1 0

Lap by Lap Analysis

Lap 11 | TimDC 25 RJ 27 | RedBoT ^h3 •‹FLYING ET 616 Jam
Player Graph Player Graph Player Graph Player Graph Player Graph
Total 4:00.75 4:02.84 4:06.16 4:11.87 4:12.31
+ 2.09 + 5.41 + 11.12 + 11.56
100%: 57.55 101%: 58.13 103%: 59.28 105%: 1:00.42 107%: 1:01.57 >107%: >1:01.57 Pitstop Takeover Penalty Lap Rejoin
1 1:04.22 1:07.51 1:06.36 1:07.25 1:11.16
2 57.93 58.68 58.29 59.65 59.68
3 57.55 58.28 58.13 58.39 59.51
4 1:01.05 58.37 1:03.38 1:06.58 1:01.96