mpRes » Single Event » [MRc] E-Challenge » 2020 » Round 01 Racede | en

[MRc] E-Challenge Season 2020 - Round 01 Race (replay) download
Version LfS 0.6U RB4 MRT AU1X
Time 12.12.2020, 16:59:56
Distance 100 Laps (-)
Daytime Morning FZ5 FOX
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
8 of 17 cars finished the race.
1 (+4) 95 J. Virtanen FOX 100 2h 08:36.87 1 - 1:13.09 34 (46-51, 71, 74-100) X X W
2 (-1) 88 S.Lee FOX 100 + 54.28 2 - 1:12.75 66 (1-45, 52-70, 72-73) X X M
3 (+3) 43 Dn. Balla FOX 99 + 1 Lap + 1 Lap 1 - 1:12.58 0 X X W
4 (-1) 34 K. Motiejuitis FOX 99 + 1 Lap + 7.81 1 - 1:13.22 0 X W
5 (+2) 16 E.Kaan FOX 99 + 1 Lap + 0.74 2 - 1:12.61 0 X X M
6 (-4) 15 I. Azhar FOX 99 + 1 Lap + 1.11 1 - 1:12.45 0 X X W
7 (+3) 99 D. Revega FOX 94 + 6 Laps + 5 Laps 1 - 1:14.60 0 X X W
8 P 75 G. Jobahazi FOX 92 + 8 Laps + 2 Laps 1 - 1:15.17 0 W
9 (-1) 8 R. Nemeth FOX 80 + 20 Laps† 2 - 1:14.55 0 X X W
10 (-1) 22 M. Bajoras FOX 40 + 60 Laps† 0 - 1:16.40 0 X W
11 (-7) 6 J.Petcke FOX 17 + 83 Laps† 0 - 1:14.61 0 X W
12 (-1) 46 S.Tautkevičius FOX 14 + 86 Laps† 1 - 1:17.13 0 X W
13 (-1) 27 J. Jefin FOX 9 + 91 Laps† 0 - 1:16.31 0 X X M
14 (+1) Elmo RB4 1 + 99 Laps† 0 - 4:30.37 0 X X W
15 (-2) Tim De Cnodder FZ5 0 + 100 Laps† 0 - 0.00 0 X X W
16 (±0) Michal Málek MRT 0 + 100 Laps† 0 - 0.00 0 X X W
17 (-3) Jaroslav Dohnalík RB4 0 + 100 Laps† 0 - 0.00 0 X X M

Pitstops

Name Lap Work Time [s] Total
10 cars made 13 pitstops with a total time of 3:17.31
15 I. Azhar 63 2_0_0 2.18 2.18
43 Dn. Balla 65 522_15_0 7.58 7.58
95 J. Virtanen 51 522_15_0 7.62 7.62
34 K. Motiejuitis 53 522_15_0 8.03 8.03
88 S.Lee 47 514_3_0 4.29 11.69
83 522_15_0 7.40
99 D. Revega 47 17162_15_0 21.18 21.18
46 S.Tautkevičius 13 33030_0_0 26.27 26.27
16 E.Kaan 49 522_15_0 7.26 26.84
54 17162_15_0 19.58
75 G. Jobahazi 69 33550_15_0 32.65 32.65
8 R. Nemeth 53 33294_15_0 26.90 53.27
72 33030_0_0 26.37

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
Elmo 4:30.37 - 1 0.00
22 M. Bajoras 1:25.39 - 40 6.98
88 S.Lee 1:17.71 - 100 7.96
15 I. Azhar 1:18.05 - 99 8.06
34 K. Motiejuitis 1:18.04 - 99 8.24
95 J. Virtanen 1:17.17 - 100 8.79
43 Dn. Balla 1:17.96 - 99 9.04
16 E.Kaan 1:18.04 - 99 9.23
8 R. Nemeth 1:22.66 - 80 9.74
6 J.Petcke 1:25.59 - 17 10.12
99 D. Revega 1:23.04 - 94 10.43
75 G. Jobahazi 1:24.02 - 92 10.68
46 S.Tautkevičius 1:36.14 - 14 19.15
27 J. Jefin 1:37.54 - 9 20.98

Sector Times

Name Best Sector 1 Best Sector 2 Best Sector 3 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 1:11.88
15 I. Azhar 25.85 0.20 92 28.20 0.27 93 18.30 --- 93 1:12.35 0.10 1:12.45 --- 93
43 Dn. Balla 25.83 0.18 80 28.06 0.13 93 18.61 0.31 93 1:12.50 0.08 1:12.58 0.13 93
16 E.Kaan 25.65 --- 97 27.95 0.02 39 18.36 0.06 96 1:11.96 0.65 1:12.61 0.16 92
88 S.Lee 25.97 0.32 63 27.96 0.03 48 18.31 0.01 70 1:12.24 0.51 1:12.75 0.30 63
95 J. Virtanen 26.06 0.41 66 27.93 --- 44 18.31 0.01 73 1:12.30 0.79 1:13.09 0.64 66
34 K. Motiejuitis 26.22 0.57 92 28.18 0.25 99 18.54 0.24 91 1:12.94 0.28 1:13.22 0.77 94
8 R. Nemeth 26.74 1.09 74 28.65 0.72 74 19.16 0.86 74 1:14.55 --- 1:14.55 2.10 74
99 D. Revega 26.46 0.81 90 28.79 0.86 91 18.99 0.69 92 1:14.24 0.36 1:14.60 2.15 92
6 J.Petcke 26.65 1.00 14 29.05 1.12 14 18.80 0.50 11 1:14.50 0.11 1:14.61 2.16 14
75 G. Jobahazi 26.66 1.01 77 29.14 1.21 91 19.17 0.87 78 1:14.97 0.20 1:15.17 2.72 91
27 J. Jefin 27.34 1.69 7 29.03 1.10 4 19.81 1.51 3 1:16.18 0.13 1:16.31 3.86 4
22 M. Bajoras 26.87 1.22 20 29.12 1.19 17 19.46 1.16 34 1:15.45 0.95 1:16.40 3.95 28
46 S.Tautkevičius 27.05 1.40 6 29.79 1.86 5 19.47 1.17 8 1:16.31 0.82 1:17.13 4.68 6
Elmo 209.93 184.28 1 35.58 7.65 1 24.86 6.56 1 4:30.37 --- 4:30.37 197.92 1

Flags

Name Yellows Caused Blues Seen
0 cars caused 0 yellow and 8 cars got 244 blue flags.
34 K. Motiejuitis 0 27
16 E.Kaan 0 10
99 D. Revega 0 50
75 G. Jobahazi 0 93
8 R. Nemeth 0 27
22 M. Bajoras 0 34
46 S.Tautkevičius 0 1
Jaroslav Dohnalík 0 2

Lap by Lap Analysis

Lap 95 J. Virtanen 88 S.Lee 43 Dn. Balla 34 K. Motiejuitis 16 E.Kaan 15 I. Azhar 99 D. Revega 75 G. Jobahazi 8 R. Nemeth 22 M. Bajoras 6 J.Petcke 46 S.Tautkevičius 27 J. Jefin Elmo Tim De Cnodder Michal Málek Jaroslav Dohnalík
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 2h 08:36.87 2h 09:31.15 2h 08:37.71 2h 08:45.52 2h 08:46.26 2h 08:47.37 2h 10:06.13 2h 08:49.46 1h 50:12.88 56:55.62 24:15.06 22:25.93 14:37.88 4:30.37 0.00 0.00 0.00
+ 54.28 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 6 Laps + 8 Laps + 20 Laps† + 60 Laps† + 83 Laps† + 86 Laps† + 91 Laps† + 99 Laps† + 100 Laps† + 100 Laps† + 100 Laps†
100%: 1:12.45 101%: 1:13.17 103%: 1:14.62 105%: 1:16.07 107%: 1:17.52 >107%: >1:17.52 Pitstop Takeover Penalty Lap Rejoin
1 4:00.43 3:58.12 4:14.70 4:07.29 4:02.25 4:10.92 4:13.50 4:20.35 4:04.36 4:14.34 4:01.98 4:06.01 4:14.10 4:30.37      
2 1:16.11 1:15.37 1:20.15 1:15.63 1:16.16 1:18.31 1:21.23 1:18.49 1:16.16 1:22.55 1:16.07 1:18.52 1:21.68        
3 1:14.67 1:15.01 1:15.76 1:15.16 1:15.61 1:16.24 1:21.63 1:19.59 1:16.78 1:19.61 1:15.92 1:18.30 1:18.29        
4 1:14.96 1:14.84 1:15.82 1:14.81 1:14.21 1:15.85 1:20.59 1:19.06 1:16.24 1:19.57 1:16.99 1:18.55 1:16.31        
5 1:14.98 1:14.35 1:16.40 1:15.14 1:14.28 1:15.67 1:18.92 1:20.22 1:15.61 1:18.80 1:16.31 1:17.50 1:17.25        
6 1:14.82 1:14.73 1:15.40 1:15.69 1:14.30 1:16.51 1:19.99 1:21.87 1:26.53 1:19.60 1:15.76 1:17.13 1:18.07        
7 1:15.12 1:15.11 1:16.62 1:14.93 1:15.83 1:14.39 1:20.38 1:20.87 1:17.75 1:19.31 1:15.30 1:23.31 1:17.02        
8 1:14.26 1:14.67 1:15.76 1:15.37 1:14.55 1:14.59 1:19.74 1:22.51 1:16.81 1:19.18 1:16.65 1:17.91 1:17.79        
9 1:14.10 1:14.63 1:15.37 1:15.23 1:13.90 1:15.53 1:19.76 1:22.70 1:15.69 1:51.09 1:16.91 1:19.20 1:17.37        
10 1:14.95 1:14.31 1:15.68 1:15.34 1:14.04 1:15.46 1:21.35 1:22.36 1:17.20 1:24.88 1:15.25 1:23.99          
11 1:14.38 1:14.88 1:15.84 1:15.19 1:14.26 1:15.73 1:19.93 1:21.76 1:15.95 1:23.26 1:15.94 1:28.66          
12 1:13.93 1:14.23 1:15.23 1:15.60 1:14.44 1:16.32 1:25.90 1:22.85 1:16.71 1:18.88 1:15.44 1:18.34          
13 1:15.33 1:14.45 1:15.16 1:15.73 1:14.53 1:14.93 1:19.18 1:21.27 1:16.12 1:22.87 1:15.04 2:12.76          
14 1:15.56 1:14.52 1:15.18 1:15.09 1:14.52 1:15.73 1:22.01 1:23.70 1:16.80 1:21.85 1:14.61 1:25.75          
15 1:14.52 1:14.38 1:16.20 1:31.30 1:14.37 1:15.78 1:22.86 1:29.80 1:37.85 1:20.95 1:16.15            
16 1:14.79 1:13.53 1:15.24 1:23.08 1:13.74 1:15.71 1:22.32 1:19.57 1:27.67 1:21.27 1:15.30            
17 1:14.43 1:13.88 1:15.19 1:31.35 1:14.99 1:15.45 1:21.06 1:21.40 1:21.71 1:18.75 1:15.44            
18 1:14.60 1:14.53 1:15.20 1:21.28 1:14.49 1:15.34 1:20.01 1:24.29 1:16.79 1:21.56              
19 1:14.75 1:14.08 1:15.14 1:14.24 1:14.55 1:14.39 1:18.91 1:26.23 1:17.31 1:20.80              
20 1:14.69 1:14.96 1:15.02 1:14.51 1:14.01 1:15.03 1:19.84 1:20.59 1:16.24 1:17.43              
21 1:14.85 1:14.76 1:15.37 1:15.07 1:14.19 1:15.34 1:19.90 1:23.04 1:15.45 1:20.40              
22 1:13.73 1:14.57 1:14.90 1:14.84 1:14.45 1:15.35 1:21.37 1:20.21 1:17.31 1:21.14              
23 1:14.12 1:14.35 1:14.46 1:14.60 1:14.89 1:15.31 1:28.17 1:23.52 1:16.52 1:19.25              
24 1:14.02 1:13.47 1:15.36 1:14.25 1:13.89 1:15.10 1:21.09 1:21.74 1:19.57 1:17.28              
25 1:13.97 1:14.21 1:14.88 1:14.49 1:14.35 1:14.91 1:39.78 1:21.30 1:18.14 1:22.22              
26 1:14.24 1:14.69 1:15.41 1:14.42 1:13.63 1:15.25 1:26.15 1:21.69 1:19.49 1:22.28              
27 1:14.45 1:14.47 1:14.57 1:14.99 1:14.33 1:15.06 1:19.62 1:21.46 1:20.16 1:18.40              
28 1:14.13 1:13.84 1:14.59 1:14.46 1:13.90 1:14.57 1:20.34 1:24.53 1:20.84 1:16.40              
29 1:13.29 1:14.21 1:14.56 1:14.42 1:14.35 1:14.51 1:21.88 1:20.42 1:17.71 1:19.00              
30 1:14.09 1:13.96 1:14.57 1:14.09 1:13.50 1:14.56 1:20.93 1:24.24 1:16.27 1:19.85              
31 1:13.37 1:14.02 1:14.75 1:14.25 1:14.36 1:14.36 1:18.13 1:21.58 1:17.46 1:20.15              
32 1:14.08 1:13.57 1:14.35 1:14.29 1:14.50 1:14.19 1:18.77 1:21.66 1:17.70 1:26.90              
33 1:14.76 1:14.15 1:15.36 1:14.25 1:14.82 1:14.63 1:18.78 1:22.32 1:16.81 1:19.44              
34 1:13.78 1:14.07 1:14.89 1:14.76 1:13.08 1:14.37 1:18.14 1:22.39 1:18.47 1:17.38              
35 1:14.18 1:14.28 1:14.93 1:14.44 1:14.16 1:14.67 1:18.07 1:19.06 1:25.95 1:17.62              
36 1:14.03 1:14.53 1:14.61 1:14.05 1:13.82 1:14.62 1:17.92 1:20.47 1:21.55 1:18.24              
37 1:14.29 1:13.46 1:14.84 1:14.35 1:14.29 1:14.93 1:17.82 1:20.01 1:22.07 1:18.92              
38 1:13.67 1:14.27 1:14.54 1:14.30 1:14.22 1:14.57 1:17.76 1:22.97 1:16.51 1:20.50              
39 1:13.14 1:13.97 1:14.92 1:14.22 1:12.92 1:14.43 1:20.16 1:18.54 1:16.38 1:18.71              
40 1:14.36 1:14.14 1:14.27 1:14.77 1:14.63 1:14.70 1:20.65 1:17.39 1:16.70 1:24.99              
41 1:14.21 1:14.57 1:14.54 1:14.22 1:14.24 1:14.29 1:19.70 1:18.16 1:18.28                
42 1:13.79 1:14.05 1:14.89 1:14.64 1:14.01 1:14.60 1:18.10 1:18.35 1:17.41                
43 1:13.52 1:14.31 1:14.91 1:15.53 1:15.41 1:14.59 1:18.47 1:19.23 1:17.07                
44 1:13.58 1:13.93 1:15.92 1:15.97 1:13.46 1:14.60 1:17.97 1:20.38 1:17.49                
45 1:13.66 1:13.13 1:14.91 1:15.70 1:13.71 1:14.16 1:22.30 1:19.66 1:19.20                
46 1:14.34 1:29.51 1:15.46 1:14.75 1:13.80 1:14.64 1:26.59 1:19.33 1:16.55                
47 1:13.32 1:27.25 1:14.98 1:14.28 1:13.74 1:14.54 2:07.97 1:19.62 1:17.52                
48 1:13.79 1:13.20 1:14.77 1:15.16 1:14.02 1:15.03 1:28.78 1:20.01 1:17.45                
49 1:13.76 1:13.08 1:14.85 1:14.49 1:38.35 1:14.91 1:18.65 1:19.42 1:21.85                
50 1:13.74 1:13.77 1:14.51 1:14.31 1:19.94 1:15.69 1:18.64 1:20.15 1:17.51                
51 1:36.29 1:13.89 1:14.91 1:14.78 1:14.21 1:14.81 1:21.99 1:18.83 1:17.79                
52 1:20.23 1:12.97 1:14.88 1:14.91 1:13.66 1:14.62 1:18.11 1:19.33 1:17.75                
53 1:14.48 1:14.72 1:14.76 1:38.70 1:14.77 1:14.78 1:19.22 1:18.79 2:14.22                
54 1:14.02 1:15.07 1:14.81 1:21.62 1:52.51 1:14.74 1:21.27 1:18.63 1:25.37                
55 1:14.07 1:13.83 1:14.61 1:14.71 1:37.14 1:15.20 1:16.74 1:18.73 1:17.14                
56 1:13.92 1:14.62 1:14.19 1:14.73 1:20.88 1:14.66 1:19.03 1:24.71 1:29.71                
57 1:14.10 1:14.23 1:14.57 1:14.81 1:13.65 1:14.93 1:17.58 1:21.47 1:19.09                
58 1:13.44 1:13.82 1:15.19 1:14.36 1:15.31 1:15.45 1:20.66 1:18.75 1:22.38                
59 1:13.87 1:14.76 1:14.16 1:14.47 1:14.28 1:14.92 1:17.68 1:19.01 1:17.36                
60 1:13.63 1:13.56 1:15.03 1:15.89 1:14.84 1:15.63 1:19.93 1:23.41 1:21.23                
61 1:14.33 1:15.02 1:14.83 1:14.79 1:13.89 1:14.93 1:17.29 1:19.74 1:21.63                
62 1:14.02 1:14.27 1:14.23 1:14.54 1:14.28 1:14.56 1:18.40 1:18.92 1:23.09                
63 1:13.70 1:12.75 1:14.79 1:14.73 1:14.34 1:34.18 1:19.65 1:22.03 1:20.31                
64 1:13.85 1:14.20 1:14.40 1:14.31 1:14.16 1:22.71 1:19.00 1:18.67 1:19.49                
65 1:13.19 1:14.16 1:38.74 1:14.51 1:13.78 1:14.95 1:18.49 1:18.47 1:21.38                
66 1:13.09 1:13.04 1:21.50 1:13.93 1:13.67 1:14.48 1:21.28 1:18.30 1:20.36                
67 1:14.16 1:13.54 1:14.99 1:14.45 1:14.32 1:14.44 1:21.89 1:20.55 1:16.55                
68 1:13.50 1:13.89 1:14.08 1:14.03 1:14.12 1:30.76 1:17.14 1:18.82 1:15.94                
69 1:14.05 1:14.17 1:13.93 1:14.22 1:14.41 1:20.55 1:16.73 2:09.89 1:17.46                
70 1:13.98 1:13.62 1:14.48 1:14.58 1:14.05 1:15.14 1:21.94 1:24.27 1:16.78                
71 1:13.47 1:14.99 1:15.91 1:13.91 1:14.25 1:15.37 1:15.70 1:16.76 1:20.72                
72 1:14.63 1:13.34 1:14.59 1:13.82 1:14.73 1:14.15 1:15.87 1:19.62 2:10.73                
73 1:13.64 1:14.28 1:15.21 1:14.13 1:14.91 1:14.27 1:17.20 1:18.50 1:24.93                
74 1:14.00 1:17.11 1:14.81 1:14.03 1:13.82 1:14.43 1:17.01 1:16.42 1:14.55                
75 1:14.39 1:12.78 1:14.91 1:14.60 1:14.21 1:13.92 1:16.03 1:21.22 1:19.75                
76 1:14.48 1:14.13 1:13.72 1:13.97 1:13.60 1:13.91 1:16.30 1:15.66 1:21.31                
77 1:14.19 1:14.63 1:12.85 1:14.42 1:13.59 1:14.58 1:16.10 1:15.27 1:16.13                
78 1:13.85 1:13.85 1:13.67 1:13.82 1:14.23 1:14.32 1:16.26 1:15.63 1:15.17                
79 1:13.21 1:13.12 1:12.76 1:14.21 1:13.67 1:14.32 1:14.86 1:17.98 1:16.32                
80 1:14.81 1:14.04 1:13.56 1:13.88 1:13.75 1:13.22 1:16.24 1:31.74 1:40.57                
81 1:13.24 1:13.34 1:13.42 1:13.40 1:13.27 1:13.37 1:15.37 2:39.48                  
82 1:14.05 1:13.76 1:13.88 1:14.03 1:14.68 1:13.84 2:31.73 1:48.30                  
83 1:14.48 1:42.11 1:14.71 1:14.20 1:13.75 1:13.75 1:42.79 1:17.74                  
84 1:14.45 1:20.39 1:14.33 1:14.12 1:14.45 1:14.54 1:16.89 1:17.00                  
85 1:14.78 1:14.71 1:14.71 1:14.48 1:13.23 1:15.50 1:15.44 1:18.76                  
86 1:14.41 1:14.30 1:14.26 1:14.16 1:29.15 1:14.30 1:15.99 1:22.39                  
87 1:15.43 1:13.74 1:14.67 1:38.28 1:44.31 1:41.49 1:15.38 1:19.72                  
88 1:15.99 1:48.02 2:38.60 2:23.03 2:22.12 2:23.41 1:15.33 1:17.07                  
89 2:36.53 2:11.27 1:19.54 1:15.53 1:15.56 1:15.08 1:14.88 1:16.71                  
90 1:22.60 1:14.11 1:14.48 1:14.49 1:12.83 1:13.34 1:14.69 1:16.06                  
91 1:14.23 1:14.50 1:14.55 1:13.35 1:12.93 1:13.05 1:14.77 1:15.17                  
92 1:14.30 1:13.82 1:13.12 1:13.60 1:12.61 1:12.62 1:14.60 1:18.61                  
93 1:14.52 1:15.46 1:12.58 1:13.70 1:12.62 1:12.45 1:15.22                    
94 1:13.32 1:14.58 1:15.54 1:13.22 1:15.82 1:17.26 1:45.75                    
95 1:14.32 1:14.51 1:15.90 1:14.32 1:14.69 1:14.21                      
96 1:14.87 1:14.57 1:15.67 1:14.10 1:15.81 1:14.26                      
97 1:15.42 1:14.77 1:15.42 1:15.97 1:15.97 1:16.57                      
98 1:16.05 1:15.05 1:14.52 1:13.68 1:13.56 1:13.79                      
99 1:16.34 1:23.89 1:21.81 1:13.68 1:13.88 1:15.25                      
100 1:21.31 1:37.48                              

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)