mpRes » League » [MRc] GTR Monday » 2020 » Round 13 Racede | en

[MRc] GTR Monday Season 2020 - Round 13 Race (replay) download
Version LfS 0.6U RB4 FZ5 FXR AS3
Time 30.03.2020, 19:13:11
Distance 30 Laps (168.06 km)
Daytime Afternoon XRR FZR  
Weather Cloudy
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
29 of 43 cars finished the race.
1 (+7) 09 APEX.MartisB FZR 30 59:12.89 1 - 1:51.30 2 (29-30) X W
2 (-1) AA™| チαται FZR 30 + 0.75 1 - 1:50.74 14 (1-7, 12-18) W
3 (+2) 09 APEX.Sherlock FZR 30 + 2.12 + 1.37 1 - 1:50.59 0 X W
4 (-1) Trespasser FXR 30 + 4.04 + 1.92 1 - 1:51.32 10 (19-28) X M
5 (-1) [FFM]^^6Number FZR 30 + 6.56 + 2.52 1 - 1:50.98 0 X X X W
6 (±0) [WCL] J.Katila FZR 30 + 10.09 + 3.53 1 - 1:51.00 0 X X W
7 (+2) B2マ Rejekt FZR 30 + 10.84 + 0.75 1 - 1:51.66 0 X X M
8 (+11) Ohnifus XRR 30 + 13.22 + 2.38 1 - 1:51.56 0 X X W
9 (+16) Fairy FXR 30 + 18.65 + 5.43 1 - 1:52.40 0 X X M
10 (+12) [MRc]Łukasz FXR 30 + 25.80 + 7.15 1 - 1:52.09 0 X X X M
11 (+2) イムm® Vinsu FXR 30 + 27.03 + 1.23 1 - 1:51.70 1 (8) X X W
12 (±0) GG eRotika FZR 30 + 27.44 + 0.41 1 - 1:51.43 3 (9-11) X X X M
13 (+1) [FFM]^^6sermilan XRR 30 + 28.75 + 1.31 1 - 1:51.40 0 X X W
14 (+17) Simgintas FXR 30 + 33.99 + 5.24 2 - 1:52.53 0 X X X X M
15 (+12) B2マ IVA XRR 30 + 34.62 + 0.63 1 - 1:52.48 0 X X W
16 (+16) KrzychOo FXR 30 + 37.13 + 2.51 1 - 1:52.97 0 X X X X X M
17 (-15) B2マ Upsas FZR 30 + 38.86 + 1.73 1 - 1:51.02 0 X X X M
18 (±0) AA™| Swiftzz FXR 30 + 39.83 + 0.97 1 - 1:52.45 0 X X M
19 (+17) Karolis XRR 30 + 44.52 + 4.69 2 - 1:52.93 0 X X X M
20 (+6) [WCL] J.A.Katila XRR 30 + 52.02 + 7.50 1 - 1:52.39 0 X X W
21 (+7) TRR. Firexter FZR 30 + 54.87 + 2.85 1 - 1:52.81 0 X X W
22 (+11) [MRc] Svinja FXR 30 + 55.59 + 0.72 1 - 1:53.39 0 X X X M
23 (-12) Jaroslav Dohnalík XRR 30 + 58.49 + 2.90 1 - 1:51.69 0 X W
24 P [WCL] Eza FXR 30 + 1:10.78 + 12.29 1 - 1:54.33 0 W
25 (+5) Gustas1 XRR 30 + 1:23.37 + 12.59 1 - 1:53.18 0 X X X X W
26 (-9) GG Rimtas XRR 30 + 1:27.26 + 3.89 2 - 1:52.59 0 X X W
27 P Jereloco FZR 30 + 1:40.95 + 13.69 3 - 1:52.24 0 W
28 P [ATR] CAB€Z®N FXR 29 + 1 Lap + 1 Lap 1 - 1:55.57 0 W
29 (-8) [MRc] Michal XRR 29 + 1 Lap + 48.22 1 - 1:52.04 0 X X W
30 (-1) GG Tautvydas FZR 22 + 8 Laps† 2 DT (Speeding) 1:53.48 0 X X M
31 (-8) Alfa-QV FXR 14 + 16 Laps† 1 - 1:52.91 0 X X X W
32 (-17) TRR. Texas XRR 12 + 18 Laps† 1 - 1:54.35 0 X X W
33 (+1) [MRc]KIG XRR 10 + 20 Laps† 1 - 1:53.43 0 X X M
34 (-14) B2マMeesmetsas FZR 4 + 26 Laps† 1 - 1:53.57 0 X W
35 (+2) S A F E T Y C A R FZ5 4 + 26 Laps† 1 - 2:40.45 0 X X X X M
36 (-20) [6S] Fwank FZR 4 + 26 Laps† 0 - 1:52.93 0 X X X W
37 (-27) [MRc] RJ FXR 2 + 28 Laps† 1 - 2:08.16 0 X W
38 P >Race Control< RB4 1 + 29 Laps† 0 - 24:44.52 0 W
39 P M E D I C A L C A R FZ5 0 + 30 Laps† 0 - 0.00 0 W
40 (-5) Teho l yungtommyb FXR 0 + 30 Laps† 0 - 0.00 0 X M
41 (-34) GenR uNite FZR 0 + 30 Laps† 0 - 0.00 0 X W
42 P M E D I C A L CAR RB4 0 + 30 Laps† 0 - 0.00 0 W
43 (-19) [MRc]StepanYL XRR 0 + 30 Laps† 0 - 0.00 0 X X X X W

Pitstops

Name Lap Work Time [s] Total
36 cars made 42 pitstops with a total time of 6:16.82
[ATR] CAB€Z®N 21 2_0_0 1.16 1.16
Alfa-QV 8 2_0_0 1.16 1.16
Trespasser 8 2_0_0 1.17 1.17
[MRc]Łukasz 12 2_0_0 1.18 1.18
KrzychOo 3 2_0_0 1.18 1.18
[WCL] J.A.Katila 8 2_0_0 1.22 1.22
[MRc]KIG 8 2_0_0 1.22 1.22
TRR. Texas 8 2_0_0 1.23 1.23
Ohnifus 8 2_0_0 1.23 1.23
Gustas1 7 2_0_0 1.24 1.24
09 APEX.MartisB 8 2_0_0 1.28 1.28
[FFM]^^6Number 1 2_0_0 1.28 1.28
AA™| チαται 8 2_0_0 1.31 1.31
Fairy 8 2_0_0 1.59 1.59
イムm® Vinsu 9 2_0_0 1.86 1.86
[FFM]^^6sermilan 9 131074_0_0 2.07 2.07
[MRc] RJ 1 2_0_0 2.32 2.32
[WCL] Eza 7 2_0_0 2.45 2.45
B2マ IVA 7 2_0_0 2.51 2.51
B2マ Rejekt 8 131074_0_0 4.61 4.61
Jaroslav Dohnalík 1 131074_0_0 5.07 5.07
[MRc] Michal 8 131074_0_0 6.24 6.24
TRR. Firexter 14 131074_0_0 6.30 6.30
B2マ Upsas 8 162_12_0 7.28 7.28
AA™| Swiftzz 9 10402_15_0 13.18 13.18
GG eRotika 12 10402_15_0 13.27 13.27
S A F E T Y C A R 4 10402_15_0 13.28 13.28
B2マMeesmetsas 2 32770_0_0 14.11 14.11
09 APEX.Sherlock 4 141474_15_0 15.17 15.17
[MRc] Svinja 2 32834_0_0 20.16 20.16
GG Rimtas 8 131074_0_0 9.93 25.29
27 10402_15_0 15.36
[WCL] J.Katila 6 36930_0_0 25.29 25.29
Karolis 2 164882_0_0 25.84 34.06
7 131074_0_0 8.22
Jereloco 6 2_0_0 1.55 40.12
12 37890_0_0 25.29
17 10402_15_0 13.28
Simgintas 2 2_0_0 1.17 44.35
3 38130_12_0 43.18
GG Tautvydas 8 141474_15_0 16.16 1:00.38
12 175346_15_0 44.22

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
>Race Control< 24:44.52 13.59 1 0.00
[MRc] RJ 2:14.32 150.15 2 0.00
[ATR] CAB€Z®N 2:02.52 164.60 29 9.74
[WCL] Eza 2:00.79 166.96 30 12.01
Gustas1 2:01.21 166.38 30 12.48
B2マ IVA 1:59.58 168.65 30 12.70
KrzychOo 1:59.67 168.53 30 12.89
TRR. Firexter 2:00.26 167.70 30 12.99
B2マ Rejekt 1:58.79 169.77 30 13.03
[MRc] Svinja 2:00.28 167.67 30 13.05
Fairy 1:59.05 169.40 30 13.17
Simgintas 1:59.56 168.68 30 13.39
[MRc]KIG 2:03.84 162.85 10 13.48
[FFM]^^6Number 1:58.65 169.97 30 13.48
[WCL] J.A.Katila 2:00.16 167.83 30 13.55
[MRc]Łukasz 1:59.29 169.06 30 13.57
GG Rimtas 2:01.34 166.21 30 13.69
Ohnifus 1:58.87 169.66 30 13.76
B2マMeesmetsas 2:05.00 161.33 4 13.79
Jereloco 2:01.79 165.58 30 14.25
B2マ Upsas 1:59.73 168.45 30 14.30
09 APEX.MartisB 1:58.43 170.29 30 14.42
09 APEX.Sherlock 1:58.50 170.19 30 14.59
Karolis 1:59.91 168.18 30 14.73
GG eRotika 1:59.34 168.98 30 15.00
Trespasser 1:58.56 170.10 30 15.13
AA™| チαται 1:58.45 170.25 30 15.28
[WCL] J.Katila 1:58.77 169.81 30 15.30
AA™| Swiftzz 1:59.76 168.40 30 15.40
イムm® Vinsu 1:59.33 169.00 30 15.78
[FFM]^^6sermilan 1:59.39 168.92 30 16.65
TRR. Texas 2:05.94 160.14 12 17.14
Alfa-QV 2:06.56 159.35 14 17.78
Jaroslav Dohnalík 2:00.38 167.53 30 18.93
GG Tautvydas 2:05.50 160.70 22 19.26
[MRc] Michal 2:04.18 162.40 29 43.19
S A F E T Y C A R 5:58.83 56.20 4 3:31.57
[6S] Fwank 8:22.99 40.09 4 7:54.14

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 1:50.48
09 APEX.Sherlock 48.92 --- 28 61.56 --- 26 1:50.48 0.11 1:50.59 --- 26
AA™| チαται 49.00 0.08 30 61.68 0.12 28 1:50.68 0.06 1:50.74 0.15 30
[FFM]^^6Number 49.01 0.09 29 61.87 0.31 28 1:50.88 0.10 1:50.98 0.39 29
[WCL] J.Katila 49.05 0.13 27 61.95 0.39 27 1:51.00 --- 1:51.00 0.41 27
B2マ Upsas 49.06 0.14 25 61.88 0.32 27 1:50.94 0.08 1:51.02 0.43 27
09 APEX.MartisB 49.16 0.24 29 62.07 0.51 30 1:51.23 0.07 1:51.30 0.71 30
Trespasser 49.27 0.35 18 62.04 0.48 25 1:51.31 0.01 1:51.32 0.73 28
[FFM]^^6sermilan 49.29 0.37 30 62.07 0.51 22 1:51.36 0.04 1:51.40 0.81 22
GG eRotika 49.23 0.31 27 62.20 0.64 27 1:51.43 --- 1:51.43 0.84 27
Ohnifus 49.23 0.31 19 62.22 0.66 22 1:51.45 0.11 1:51.56 0.97 21
B2マ Rejekt 49.30 0.38 24 62.30 0.74 25 1:51.60 0.06 1:51.66 1.07 24
Jaroslav Dohnalík 49.27 0.35 19 62.28 0.72 29 1:51.55 0.14 1:51.69 1.10 19
イムm® Vinsu 49.54 0.62 29 62.16 0.60 29 1:51.70 --- 1:51.70 1.11 29
[MRc] Michal 49.27 0.35 27 62.63 1.07 18 1:51.90 0.14 1:52.04 1.45 27
[MRc]Łukasz 49.56 0.64 20 62.45 0.89 27 1:52.01 0.08 1:52.09 1.50 27
Jereloco 49.64 0.72 30 62.55 0.99 26 1:52.19 0.05 1:52.24 1.65 26
[WCL] J.A.Katila 49.43 0.51 29 62.76 1.20 19 1:52.19 0.20 1:52.39 1.80 19
Fairy 49.67 0.75 26 62.63 1.07 29 1:52.30 0.10 1:52.40 1.81 24
AA™| Swiftzz 49.78 0.86 20 62.61 1.05 5 1:52.39 0.06 1:52.45 1.86 27
B2マ IVA 49.58 0.66 21 62.81 1.25 30 1:52.39 0.09 1:52.48 1.89 30
Simgintas 49.58 0.66 23 62.55 0.99 22 1:52.13 0.40 1:52.53 1.94 27
GG Rimtas 49.31 0.39 8 62.88 1.32 24 1:52.19 0.40 1:52.59 2.00 24
TRR. Firexter 49.72 0.80 26 62.99 1.43 29 1:52.71 0.10 1:52.81 2.22 29
Alfa-QV 49.94 1.02 4 62.89 1.33 3 1:52.83 0.08 1:52.91 2.32 3
Karolis 49.65 0.73 27 63.13 1.57 30 1:52.78 0.15 1:52.93 2.34 30
[6S] Fwank 49.80 0.88 4 63.13 1.57 4 1:52.93 --- 1:52.93 2.34 4
KrzychOo 49.97 1.05 27 62.88 1.32 5 1:52.85 0.12 1:52.97 2.38 7
Gustas1 49.86 0.94 22 63.09 1.53 4 1:52.95 0.23 1:53.18 2.59 4
[MRc] Svinja 50.13 1.21 22 63.19 1.63 19 1:53.32 0.07 1:53.39 2.80 19
[MRc]KIG 49.79 0.87 6 63.63 2.07 5 1:53.42 0.01 1:53.43 2.84 6
GG Tautvydas 49.80 0.88 22 63.18 1.62 19 1:52.98 0.50 1:53.48 2.89 16
B2マMeesmetsas 50.09 1.17 4 63.10 1.54 3 1:53.19 0.38 1:53.57 2.98 4
[WCL] Eza 50.44 1.52 15 63.61 2.05 18 1:54.05 0.28 1:54.33 3.74 6
TRR. Texas 50.10 1.18 8 63.94 2.38 5 1:54.04 0.31 1:54.35 3.76 3
[ATR] CAB€Z®N 50.75 1.83 7 64.41 2.85 29 1:55.16 0.41 1:55.57 4.98 18
[MRc] RJ 55.74 6.82 2 72.42 10.86 2 2:08.16 --- 2:08.16 17.57 2
S A F E T Y C A R 72.63 23.71 4 83.75 22.19 2 2:36.38 4.07 2:40.45 49.86 3
>Race Control< 1070.94 1022.02 1 413.58 352.02 1 24:44.52 --- 24:44.52 1373.93 1

Flags

Name Yellows Caused Blues Seen
39 cars caused 632 yellow and 8 cars got 57 blue flags.
09 APEX.MartisB 25 0
AA™| チαται 25 0
09 APEX.Sherlock 21 0
Trespasser 27 0
[FFM]^^6Number 20 0
[WCL] J.Katila 20 0
B2マ Rejekt 16 0
Ohnifus 13 0
Fairy 24 0
[MRc]Łukasz 22 0
イムm® Vinsu 18 0
GG eRotika 16 0
[FFM]^^6sermilan 19 0
Simgintas 10 0
B2マ IVA 16 0
KrzychOo 20 0
B2マ Upsas 24 0
AA™| Swiftzz 19 0
Karolis 7 4
[WCL] J.A.Katila 17 0
TRR. Firexter 24 0
[MRc] Svinja 16 0
Jaroslav Dohnalík 14 0
[WCL] Eza 13 0
Gustas1 23 0
GG Rimtas 24 0
Jereloco 15 0
[ATR] CAB€Z®N 9 1
[MRc] Michal 8 27
GG Tautvydas 19 1
Alfa-QV 24 0
TRR. Texas 17 0
[MRc]KIG 13 0
S A F E T Y C A R 20 13
[6S] Fwank 4 8
[MRc] RJ 1 0
>Race Control< 6 1
M E D I C A L CAR 2 2
[MRc]StepanYL 1 0

Penalties

Name Lap Description
2 cars got a total of 3 penalties.
GG Tautvydas 12 DT (Speeding)
22 DT Cleared
23 DT (Speeding)
[MRc] RJ 1 DT (Speeding)
2 DT Cleared

Lap by Lap Analysis

Lap 09 APEX.MartisB AA™| チαται 09 APEX.Sherlock Trespasser [FFM]^^6Number [WCL] J.Katila B2マ Rejekt Ohnifus Fairy [MRc]Łukasz イムm® Vinsu GG eRotika [FFM]^^6sermilan Simgintas B2マ IVA KrzychOo B2マ Upsas AA™| Swiftzz Karolis [WCL] J.A.Katila TRR. Firexter [MRc] Svinja Jaroslav Dohnalík [WCL] Eza Gustas1 GG Rimtas Jereloco [ATR] CAB€Z®N [MRc] Michal GG Tautvydas Alfa-QV TRR. Texas [MRc]KIG B2マMeesmetsas S A F E T Y C A R [6S] Fwank [MRc] RJ >Race Control< M E D I C A L C A R Teho l yungtommyb GenR uNite M E D I C A L CAR [MRc]StepanYL
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 59:12.89 59:13.64 59:15.01 59:16.93 59:19.45 59:22.98 59:23.73 59:26.11 59:31.54 59:38.69 59:39.92 59:40.33 59:41.64 59:46.88 59:47.51 59:50.02 59:51.75 59:52.72 59:57.41 1h 00:04.91 1h 00:07.76 1h 00:08.48 1h 00:11.38 1h 00:23.67 1h 00:36.26 1h 00:40.15 1h 00:53.84 59:13.14 1h 00:01.36 46:00.95 29:31.80 25:11.25 20:38.37 8:20.01 23:55.31 33:31.96 4:28.63 24:44.52 0.00 0.00 0.00 0.00 0.00
+ 0.75 + 2.12 + 4.04 + 6.56 + 10.09 + 10.84 + 13.22 + 18.65 + 25.80 + 27.03 + 27.44 + 28.75 + 33.99 + 34.62 + 37.13 + 38.86 + 39.83 + 44.52 + 52.02 + 54.87 + 55.59 + 58.49 + 1:10.78 + 1:23.37 + 1:27.26 + 1:40.95 + 1 Lap + 1 Lap + 8 Laps† + 16 Laps† + 18 Laps† + 20 Laps† + 26 Laps† + 26 Laps† + 26 Laps† + 28 Laps† + 29 Laps† + 30 Laps† + 30 Laps† + 30 Laps† + 30 Laps† + 30 Laps†
100%: 1:50.59 101%: 1:51.69 103%: 1:53.90 105%: 1:56.11 107%: 1:58.33 >107%: >1:58.33 Pitstop Takeover Penalty Lap Rejoin
1 2:03.34 1:59.99 2:02.93 2:01.00 2:20.08 2:03.90 2:04.19 2:08.22 2:08.42 2:12.44 2:04.32 2:03.69 2:06.33 2:12.72 2:10.50 2:09.51 2:02.61 2:06.79 2:13.41 2:11.04 2:15.18 2:14.70 2:29.70 2:13.46 2:12.01 2:14.16 2:26.14 3:17.39 2:07.20 2:11.64 2:09.43 2:06.05 2:14.12 2:09.00 14:33.76 27:44.34 2:20.47 24:44.52          
2 1:52.83 1:52.28 1:52.71 1:51.93 1:57.72 1:52.99 1:55.91 1:53.80 1:53.68 1:55.99 1:53.62 1:54.06 1:53.66 2:07.61 1:54.68 1:53.95 1:52.48 1:53.76 2:50.60 1:59.00 1:59.26 2:41.17 1:57.79 1:56.33 1:54.07 1:54.79 1:54.10 1:57.30 1:54.53 1:54.52 1:54.91 1:54.41 1:57.60 2:19.25 3:14.97 1:54.29 2:08.16            
3 1:52.36 1:52.34 1:51.96 1:52.12 1:53.29 1:52.43 1:55.45 1:54.09 1:54.02 1:53.93 1:52.64 1:53.33 1:54.21 2:53.14 1:53.50 2:08.47 1:52.17 1:53.93 1:59.58 1:55.44 1:54.92 1:59.87 1:52.84 2:00.34 1:53.74 1:52.74 1:54.00 1:56.12 1:53.53 1:53.68 1:52.91 1:54.35 1:55.57 1:58.19 2:40.45 2:00.40              
4 1:53.05 1:51.81 2:38.91 1:51.99 1:53.38 1:52.22 1:54.51 1:55.43 1:54.46 1:53.85 1:52.74 1:53.06 1:52.45 2:00.24 1:53.78 1:58.82 1:53.30 1:54.29 1:54.00 1:54.01 1:54.05 1:54.13 1:52.36 1:55.08 1:53.18 1:53.17 1:54.00 1:56.21 1:54.50 1:54.16 1:54.39 1:55.33 1:53.64 1:53.57 3:26.13 1:52.93              
5 1:53.24 1:51.73 1:57.37 1:51.92 1:52.79 1:53.57 1:56.28 1:53.15 1:54.21 1:53.24 1:52.47 1:52.44 1:52.17 1:53.94 1:53.42 1:53.04 1:52.52 1:52.75 1:54.63 1:53.69 1:53.58 1:53.93 1:53.75 1:55.66 1:53.42 1:52.98 1:54.06 1:56.06 1:52.86 1:54.39 1:53.27 1:54.41 1:53.57                    
6 1:52.63 1:51.70 1:51.96 1:52.07 1:52.55 2:44.93 1:53.35 1:53.61 1:53.77 1:52.79 1:52.30 1:52.48 1:52.33 1:53.85 1:53.78 1:53.86 1:52.47 1:52.98 1:54.30 1:52.73 1:53.93 1:53.96 1:52.51 1:54.33 1:53.69 1:52.72 2:08.51 1:56.41 1:53.32 1:53.52 1:53.47 1:54.59 1:53.43                    
7 1:52.27 1:51.82 1:51.79 1:51.76 1:53.67 1:57.68 1:54.11 1:53.79 1:53.01 1:53.36 1:52.41 1:52.37 1:51.93 1:54.14 2:10.43 1:52.97 1:52.27 1:52.74 2:15.59 1:53.69 1:53.62 1:53.79 1:52.45 2:09.97 2:07.36 1:54.00 2:01.10 1:55.75 1:52.56 2:01.59 1:54.43 1:55.28 1:56.09                    
8 2:05.78 2:04.03 1:52.15 2:03.87 1:52.70 1:52.17 2:10.92 2:07.09 2:07.16 1:53.27 1:52.99 1:52.64 1:52.33 1:56.61 1:58.41 1:54.75 2:27.41 1:52.88 2:46.92 2:10.57 1:54.54 1:53.65 1:55.30 2:00.16 1:59.84 2:14.70 1:57.65 1:56.66 5:42.38 2:21.85 2:07.16 2:07.72 2:09.15                    
9 2:27.57 2:35.51 2:05.45 2:35.59 2:19.83 1:57.25 2:17.29 2:18.03 2:17.84 2:23.72 2:48.38 2:35.42 2:46.20 2:01.30 2:13.05 2:13.95 2:17.05 2:58.30 2:14.29 2:14.33 2:17.34 1:54.16 2:13.92 2:00.50 2:13.74 2:13.47 1:57.21 2:01.53 1:59.57 2:00.94 2:17.83 2:16.82 2:11.71                    
10 2:39.19 2:39.67 2:33.33 2:38.97 2:36.64 2:34.71 2:34.02 2:43.70 2:36.64 2:38.94 2:36.05 2:40.03 2:35.51 1:56.62 2:34.23 2:34.65 2:33.96 2:23.67 1:55.25 2:33.23 2:36.46 2:23.33 2:34.32 2:33.07 2:34.12 2:33.83 2:34.62 1:56.50 2:13.27 2:33.22 2:35.78 2:34.89 2:33.49                    
11 2:38.65 2:39.03 2:39.25 2:39.04 2:39.00 2:41.29 2:40.40 2:38.98 2:39.57 2:39.08 2:41.52 2:40.14 2:40.10 2:29.98 2:40.65 2:40.10 2:40.35 2:37.56 1:54.68 2:48.23 2:39.75 2:38.24 2:40.40 2:44.13 2:40.21 2:40.66 2:42.65 2:36.41 1:57.89 2:39.58 2:45.01 2:39.89                      
12 1:55.44 1:53.77 1:58.06 1:54.65 1:55.83 1:58.20 1:57.14 1:58.18 1:56.02 2:09.51 1:59.28 2:18.87 1:58.29 1:59.05 1:57.70 1:57.73 1:56.10 1:57.13 1:55.64 1:58.67 1:58.32 1:59.52 3:15.11 1:59.01 1:57.30 2:00.05 2:34.96 1:58.48 2:16.60 2:56.12 1:57.94 1:57.51                      
13 2:24.82 2:26.30 2:18.68 2:25.85 2:24.21 2:17.31 2:20.62 2:18.14 2:22.99 2:18.90 2:19.96 2:14.48 2:36.97 2:19.12 2:21.43 2:26.25 2:20.60 2:17.07 1:56.47 2:17.05 2:22.17 2:18.50 1:52.60 2:20.77 2:21.09 2:17.66 1:58.65 2:25.20 1:58.78 2:00.54 2:19.75                        
14 1:52.54 1:51.85 1:56.16 1:52.41 1:52.75 1:54.28 1:53.85 1:53.66 1:53.69 1:54.43 1:55.40 1:53.21 1:56.90 1:53.28 1:55.04 1:54.82 1:52.52 1:54.83 1:54.09 1:55.20 2:12.81 1:56.40 1:52.53 1:55.30 1:56.00 1:54.28 1:53.14 1:56.29 1:54.64 1:54.28 1:55.52                        
15 1:52.28 1:52.91 1:52.06 1:52.04 1:52.49 1:52.26 1:52.72 1:52.85 1:54.01 1:54.65 1:53.74 1:52.81 1:52.18 1:53.24 1:53.85 1:53.78 1:52.04 1:53.47 1:54.33 1:54.04 1:59.69 1:55.24 1:52.45 1:54.45 1:53.95 1:59.20 1:56.07 1:56.81 1:53.79 1:53.76                          
16 1:51.97 1:51.27 1:52.38 1:51.95 1:53.32 1:52.60 1:52.53 1:54.35 1:52.89 1:53.27 1:53.04 1:52.38 1:51.55 1:58.16 1:53.16 1:53.28 1:52.93 1:53.72 1:54.14 1:53.62 1:54.10 1:55.55 1:51.87 1:56.88 2:00.89 1:54.09 1:54.14 1:58.03 1:53.39 1:53.48                          
17 1:51.83 1:51.41 1:51.84 1:51.53 1:52.11 1:51.93 1:52.56 1:52.58 1:52.91 1:53.41 1:52.97 1:52.02 1:52.85 1:53.64 1:53.00 1:53.91 1:52.01 1:53.39 1:54.01 1:53.36 1:53.52 1:54.08 1:52.02 1:56.12 1:54.46 1:53.10 2:24.45 1:55.87 1:53.50 1:53.49                          
18 1:51.68 1:51.54 1:52.37 1:51.64 1:52.23 1:53.47 1:52.56 1:53.41 1:53.64 1:52.79 1:52.51 1:52.89 1:52.59 1:52.98 1:53.40 1:54.09 1:52.20 1:53.53 1:54.22 1:52.89 1:53.98 1:53.96 1:51.82 1:55.08 1:53.58 1:53.51 2:04.22 1:55.57 1:52.41 1:54.12                          
19 1:51.79 1:55.34 1:51.68 1:51.70 1:52.20 1:52.70 1:52.22 1:51.79 1:53.27 1:52.42 1:53.77 1:53.37 1:51.67 1:53.25 1:53.33 1:53.26 1:52.18 1:53.36 1:53.31 1:52.39 1:53.75 1:53.39 1:51.69 1:54.97 1:54.14 1:53.25 1:53.59 1:55.95 1:52.52 1:53.84                          
20 1:51.99 1:51.42 1:51.22 1:51.71 1:51.89 1:51.78 1:52.48 1:51.85 1:53.13 1:52.70 1:52.52 1:52.63 1:51.66 1:53.29 1:52.66 1:53.20 1:52.07 1:52.55 1:53.52 1:52.52 1:53.02 1:53.48 1:52.17 1:54.99 1:53.48 1:52.95 1:58.25 1:56.02 1:53.69 1:53.73                          
21 1:51.99 1:51.06 1:51.31 1:51.78 1:51.72 1:51.62 1:52.28 1:51.56 1:52.46 1:53.10 1:52.84 1:52.10 1:51.99 1:54.02 1:52.71 1:53.13 1:51.58 1:52.85 1:53.25 1:52.97 1:52.91 1:56.38 1:52.20 1:55.77 1:53.63 1:52.81 1:55.49 2:10.25 1:54.33 1:53.83                          
22 1:51.81 1:52.29 1:51.46 1:53.27 1:51.60 1:51.75 1:52.24 1:51.92 1:52.86 1:52.71 1:52.20 1:52.17 1:51.40 1:53.08 1:52.93 1:52.99 1:51.73 1:53.07 1:53.69 1:52.64 1:54.36 1:53.73 1:51.81 1:54.96 1:54.06 1:52.91 1:53.34 2:01.16 1:53.11 2:34.67                          
23 1:52.82 1:53.38 1:51.32 1:52.46 1:51.58 1:51.53 1:52.06 1:51.97 1:52.76 1:52.46 1:52.07 1:52.15 1:51.75 1:52.76 1:52.79 1:53.69 1:51.76 1:52.81 1:53.19 1:53.94 1:53.11 1:53.79 1:52.16 1:55.31 1:53.88 1:53.17 1:53.27 1:59.37 1:53.97                            
24 1:51.61 1:51.39 1:51.15 1:51.63 1:51.52 1:51.52 1:51.66 1:52.43 1:52.40 1:52.61 1:51.82 1:52.86 1:52.02 1:52.61 1:52.60 1:54.84 1:51.39 1:53.69 1:53.41 1:52.65 1:54.36 1:54.45 1:52.29 1:54.86 2:07.38 1:52.59 1:53.04 1:57.38 1:53.52                            
25 1:51.54 1:51.31 1:51.73 1:51.43 1:55.21 1:51.24 1:51.76 1:51.77 1:52.68 1:52.49 1:56.78 1:58.94 1:53.29 1:54.05 2:02.12 1:54.39 1:54.69 1:59.46 1:53.48 1:53.00 1:53.44 1:54.51 1:52.17 1:55.56 1:55.54 1:53.71 1:53.28 1:56.18 2:02.95                            
26 1:51.84 1:51.50 1:50.59 1:51.95 1:53.55 1:51.50 1:51.96 1:51.82 1:52.42 1:52.54 1:53.09 1:53.09 1:52.59 1:52.97 1:53.14 1:53.65 1:51.94 1:53.61 1:53.22 2:12.42 1:52.91 1:54.38 1:54.48 1:55.69 1:53.97 2:02.29 1:52.24 1:56.33 1:54.40                            
27 1:51.85 1:51.73 1:51.08 1:51.44 1:52.00 1:51.00 1:51.96 1:51.96 1:52.45 1:52.09 1:52.52 1:51.43 1:52.06 1:52.53 1:52.60 1:53.01 1:51.02 1:52.45 1:53.69 1:52.59 1:52.82 1:54.84 1:52.24 1:55.00 1:54.85 2:30.21 1:52.84 1:56.59 1:52.04                            
28 1:51.48 1:50.81 1:50.77 1:51.32 1:51.05 1:51.60 1:51.98 1:52.33 1:52.94 1:52.84 1:52.14 1:52.16 1:51.84 1:52.73 1:53.16 1:53.30 1:51.02 1:58.71 1:54.07 1:52.59 1:53.38 1:54.51 1:52.67 1:55.05 1:55.00 1:59.69 1:53.10 1:55.71 1:52.49                            
29 1:51.40 1:53.71 1:52.07 1:55.61 1:50.98 1:52.12 1:52.66 1:52.05 1:52.56 1:52.72 1:51.70 1:51.47 1:51.42 1:53.01 1:52.98 1:53.27 2:12.33 1:52.58 1:53.50 1:52.67 1:52.81 1:55.36 1:51.81 1:54.69 1:54.17 1:54.11 1:52.63 1:55.61 1:53.62                            
30 1:51.30 1:50.74 1:51.27 1:52.30 1:51.56 1:51.43 1:52.06 1:51.60 1:52.68 1:52.44 1:52.13 1:51.64 1:51.40 1:52.96 1:52.48 1:53.36 2:05.05 1:54.79 1:52.93 1:53.74 1:53.67 1:55.48 1:51.95 1:56.18 2:13.51 1:53.35 1:53.10                                

Lap by Lap Chart (click to enlarge)