mpRes » League » [MRc] FBM Saturday » 2020 » Round 06 Racede | en

[MRc] FBM Saturday Season 2020 - Round 06 Race (replay) download
Version LfS 0.6U FBM KY3
Time 08.02.2020, 20:24:28
Distance 16 Laps (118.04 km)
Daytime Day
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
23 of 33 cars finished the race.
1 (+5) AA™| Roger Chen 16 39:30.90 1 - 2:25.33 1 (16) X X W
2 (±0) S1DUS*Altsu 16 + 4.66 1 - 2:25.55 15 (1-15) X X W
3 (±0) S1DUS*GáboR 16 + 6.29 + 1.63 1 - 2:25.65 0 X X X X M
4 (+8) 「マァ」Sick 16 + 9.49 + 3.20 1 - 2:25.57 0 X X W
5 (+11) [GD] Kaes 16 + 18.96 + 9.47 1 - 2:26.53 0 X M
6 (+2) B2マ Ayoub_MaRoC 16 + 25.06 + 6.10 1 - 2:26.01 0 X X M
7 (+3) [MRc] gemini95 16 + 25.83 + 0.77 1 - 2:25.17 0 X X W
8 (+6) Teho | Ngottini 16 + 30.57 + 4.74 1 - 2:27.28 0 X X W
9 (+23) [MRc]MegA 16 + 34.31 + 3.74 1 - 2:26.34 0 X X X M
10 (+3) RG^^2Rony 16 + 37.93 + 3.62 1 - 2:26.69 0 X X X W
11 (-4) RG^^3Mandula 16 + 41.44 + 3.51 1 - 2:26.65 0 X X W
12 (-1) [MRc] Svinja 16 + 49.18 + 7.74 1 - 2:27.35 0 X X X M
13 (+9) Jaroslav Dohnalík 16 + 58.52 + 9.34 1 - 2:28.02 0 X X M
14 (+7) Atian'' 16 + 1:02.27 + 3.75 1 - 2:28.01 0 X X M
15 (+16) unmanned 16 + 1:16.36 + 14.09 1 - 2:27.73 0 X X W
16 (+4) kurkku87 16 + 1:19.04 + 2.68 1 - 2:29.64 0 X X X W
17 (+6) [WCL] T.Soini 16 + 1:20.43 + 1.39 1 - 2:28.62 0 X X W
18 (-1) Beelo 16 + 1:27.15 + 6.72 1 - 2:28.20 0 X X W
19 (-4) B2マ IVA 16 + 1:28.56 + 1.41 1 - 2:28.63 0 X X X W
20 (+5) kwintuspl 16 + 1:20.19 + -8.37 0 30s (Late Pitstop) 2:29.70 0 X X M
21 (+3) [ATR] CAB€Z®N 15 + 1 Lap + 1 Lap 1 - 2:31.37 0 X X X W
22 (+4) [MRc] Ricky 15 + 1 Lap + 39.95 1 - 2:29.55 0 X X X M
23 (-4) 「マァ」Regis 15 + 1 Lap + 43.19 1 - 2:28.51 0 X X W
24 (-15) Ohnifus 13 + 3 Laps† 1 - 2:26.15 0 X X X W
25 (-21) 「マァ」Pedro 10 + 6 Laps† 0 - 2:26.08 0 X X W
26 (+3) tomas 9 + 7 Laps† 1 - 2:30.97 0 X X X X Ks
27 P Teho l yungtommyb 8 + 8 Laps† 0 - 2:26.95 0 W
28 (-10) Vesa @ YouTube 7 + 9 Laps† 0 - 2:28.63 0 X X W
29 (-24) Kode 5 + 11 Laps† 0 - 2:26.17 0 X X X M
30 (-29) 「マァ」 TJ 4 + 12 Laps† 0 - 2:26.82 0 X X W
31 (-4) Lukas Jancik 2 + 14 Laps† 0 - 2:35.16 0 X X W
32 (-2) FromHell 2 + 14 Laps† 0 - 2:33.38 0 X X W
33 (-5) RobbeDoes 1 + 15 Laps† 0 - 2:49.02 0 X X X W

Pitstops

Name Lap Work Time [s] Total
24 cars made 24 pitstops with a total time of 1:52.50
「マァ」Sick 12 2_0_0 1.20 1.20
unmanned 8 2_0_0 1.20 1.20
Teho | Ngottini 14 2_0_0 1.21 1.21
Atian'' 14 2_0_0 1.21 1.21
[MRc] gemini95 9 2_0_0 1.21 1.21
[GD] Kaes 15 2_0_0 1.21 1.21
S1DUS*Altsu 15 2_0_0 1.21 1.21
[WCL] T.Soini 14 2_0_0 1.21 1.21
AA™| Roger Chen 11 2_0_0 1.21 1.21
kurkku87 15 2_0_0 1.22 1.22
[MRc]MegA 3 2_0_0 1.22 1.22
S1DUS*GáboR 1 2_0_0 1.22 1.22
B2マ Ayoub_MaRoC 14 2_0_0 1.22 1.22
RG^^3Mandula 4 2_0_0 1.22 1.22
RG^^2Rony 1 2_0_0 1.23 1.23
Beelo 6 2_0_0 1.55 1.55
B2マ IVA 1 2_0_0 1.57 1.57
[ATR] CAB€Z®N 14 2_0_0 1.67 1.67
[MRc] Svinja 7 2_0_0 1.68 1.68
Jaroslav Dohnalík 8 131074_0_0 2.42 2.42
Ohnifus 9 16646_0_0 19.21 19.21
[MRc] Ricky 2 16646_0_0 19.57 19.57
tomas 1 147718_0_0 19.69 19.69
「マァ」Regis 3 33030_0_0 26.94 26.94

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
Lukas Jancik 2:40.32 165.66 2 0.00
FromHell 17:11.41 25.75 2 0.00
RobbeDoes 2:49.02 157.13 1 0.00
「マァ」Pedro 2:27.78 179.72 10 1.24
Teho l yungtommyb 2:29.69 177.42 8 2.37
Vesa @ YouTube 2:31.46 175.35 7 2.38
S1DUS*GáboR 2:28.57 178.75 16 2.45
「マァ」 TJ 2:29.13 178.09 4 2.65
Kode 2:29.26 177.94 5 3.05
kwintuspl 2:33.19 173.37 16 3.30
[GD] Kaes 2:29.37 177.81 16 3.69
RG^^2Rony 2:30.55 176.41 16 3.83
B2マ IVA 2:33.72 172.78 16 3.90
AA™| Roger Chen 2:28.18 179.23 16 3.91
[WCL] T.Soini 2:33.21 173.35 16 3.98
Teho | Ngottini 2:30.09 176.95 16 4.13
「マァ」Sick 2:28.77 178.51 16 4.32
kurkku87 2:33.12 173.45 16 4.58
B2マ Ayoub_MaRoC 2:29.75 177.35 16 4.60
[MRc]MegA 2:30.33 176.67 16 4.69
Atian'' 2:32.07 174.64 16 4.98
Jaroslav Dohnalík 2:31.84 174.91 16 5.01
RG^^3Mandula 2:30.77 176.15 16 5.22
[MRc] gemini95 2:29.80 177.30 16 5.30
S1DUS*Altsu 2:28.47 178.88 16 5.44
Beelo 2:33.63 172.87 16 5.57
unmanned 2:32.95 173.64 16 5.61
[MRc] Svinja 2:31.26 175.59 16 5.80
tomas 2:43.55 162.38 9 9.28
[ATR] CAB€Z®N 2:39.25 166.77 15 9.29
Ohnifus 2:31.91 174.83 13 13.19
[MRc] Ricky 2:41.91 164.03 15 19.15
「マァ」Regis 2:44.79 161.16 15 20.48

Sector Times

Name Best Sector 1 Best Sector 2 Best Sector 3 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 2:25.07
[MRc] gemini95 47.12 --- 16 52.67 0.10 16 45.38 --- 16 2:25.17 --- 2:25.17 --- 16
AA™| Roger Chen 47.20 0.08 16 52.70 0.13 13 45.42 0.04 16 2:25.32 0.01 2:25.33 0.16 16
S1DUS*Altsu 47.14 0.02 13 52.58 0.01 16 45.63 0.25 12 2:25.35 0.20 2:25.55 0.38 11
「マァ」Sick 47.21 0.09 16 52.57 --- 15 45.67 0.29 15 2:25.45 0.12 2:25.57 0.40 15
S1DUS*GáboR 47.24 0.12 16 52.74 0.17 16 45.46 0.08 14 2:25.44 0.21 2:25.65 0.48 15
B2マ Ayoub_MaRoC 47.45 0.33 11 52.82 0.25 10 45.59 0.21 12 2:25.86 0.15 2:26.01 0.84 10
「マァ」Pedro 47.40 0.28 2 52.87 0.30 10 45.71 0.33 8 2:25.98 0.10 2:26.08 0.91 9
Ohnifus 47.54 0.42 12 52.72 0.15 14 45.51 0.13 11 2:25.77 0.38 2:26.15 0.98 13
Kode 47.41 0.29 4 52.72 0.15 4 45.78 0.40 2 2:25.91 0.26 2:26.17 1.00 3
[MRc]MegA 47.45 0.33 15 52.88 0.31 16 45.93 0.55 13 2:26.26 0.08 2:26.34 1.17 15
[GD] Kaes 47.48 0.36 10 52.91 0.34 13 45.80 0.42 3 2:26.19 0.34 2:26.53 1.36 10
RG^^3Mandula 47.57 0.45 4 52.94 0.37 16 45.89 0.51 2 2:26.40 0.25 2:26.65 1.48 16
RG^^2Rony 47.62 0.50 11 52.91 0.34 14 45.94 0.56 13 2:26.47 0.22 2:26.69 1.52 15
「マァ」 TJ 47.48 0.36 4 52.89 0.32 4 45.95 0.57 2 2:26.32 0.50 2:26.82 1.65 4
Teho l yungtommyb 47.60 0.48 6 52.99 0.42 7 46.01 0.63 7 2:26.60 0.35 2:26.95 1.78 6
Teho | Ngottini 47.86 0.74 14 53.03 0.46 15 46.16 0.78 3 2:27.05 0.23 2:27.28 2.11 11
[MRc] Svinja 47.86 0.74 9 53.05 0.48 13 46.40 1.02 9 2:27.31 0.04 2:27.35 2.18 9
unmanned 47.90 0.78 13 53.37 0.80 13 46.28 0.90 6 2:27.55 0.18 2:27.73 2.56 13
Atian'' 48.09 0.97 4 53.20 0.63 6 46.36 0.98 3 2:27.65 0.36 2:28.01 2.84 3
Jaroslav Dohnalík 47.86 0.74 8 53.65 1.08 8 46.14 0.76 14 2:27.65 0.37 2:28.02 2.85 14
Beelo 47.88 0.76 16 52.97 0.40 8 46.44 1.06 13 2:27.29 0.91 2:28.20 3.03 8
「マァ」Regis 48.25 1.13 13 53.26 0.69 15 46.46 1.08 8 2:27.97 0.54 2:28.51 3.34 13
[WCL] T.Soini 48.25 1.13 7 53.60 1.03 6 46.46 1.08 13 2:28.31 0.31 2:28.62 3.45 16
Vesa @ YouTube 48.20 1.08 3 53.12 0.55 2 46.92 1.54 3 2:28.24 0.39 2:28.63 3.46 6
B2マ IVA 48.22 1.10 15 53.39 0.82 4 46.76 1.38 3 2:28.37 0.26 2:28.63 3.46 3
[MRc] Ricky 48.37 1.25 12 53.33 0.76 13 47.26 1.88 12 2:28.96 0.59 2:29.55 4.38 8
kurkku87 48.21 1.09 14 53.49 0.92 9 47.13 1.75 3 2:28.83 0.81 2:29.64 4.47 12
kwintuspl 48.34 1.22 16 53.57 1.00 14 46.99 1.61 1 2:28.90 0.80 2:29.70 4.53 14
tomas 49.15 2.03 8 54.57 2.00 9 47.21 1.83 8 2:30.93 0.04 2:30.97 5.80 8
[ATR] CAB€Z®N 49.17 2.05 3 54.23 1.66 7 46.83 1.45 13 2:30.23 1.14 2:31.37 6.20 3
FromHell 49.54 2.42 2 54.08 1.51 2 47.68 2.30 1 2:31.30 2.08 2:33.38 8.21 2
Lukas Jancik 48.65 1.53 3 54.19 1.62 2 47.58 2.20 2 2:30.42 4.74 2:35.16 9.99 2
RobbeDoes 50.58 3.46 2 55.39 2.82 2 48.07 2.69 1 2:34.04 14.98 2:49.02 23.85 1

Flags

Name Yellows Caused Blues Seen
28 cars caused 86 yellow and 5 cars got 15 blue flags.
S1DUS*Altsu 1 0
「マァ」Sick 1 0
B2マ Ayoub_MaRoC 2 0
[MRc] gemini95 3 0
Teho | Ngottini 1 0
[MRc]MegA 1 0
RG^^2Rony 2 0
RG^^3Mandula 2 0
[MRc] Svinja 2 0
Jaroslav Dohnalík 1 0
Atian'' 2 0
unmanned 3 0
kurkku87 2 0
[WCL] T.Soini 2 0
Beelo 6 0
B2マ IVA 3 0
kwintuspl 4 0
[ATR] CAB€Z®N 12 2
[MRc] Ricky 12 7
「マァ」Regis 7 2
Ohnifus 3 0
「マァ」Pedro 1 0
tomas 7 2
Teho l yungtommyb 1 0
「マァ」 TJ 1 0
Lukas Jancik 2 0
FromHell 1 2
RobbeDoes 1 0

Penalties

Name Lap Description
3 cars got a total of 3 penalties.
unmanned 8 DT (Speeding)
11 DT Cleared
kwintuspl 16 30s (Late Pitstop)
[MRc] Ricky 1 DT (False Start)
2 DT Cleared

Lap by Lap Analysis

Lap AA™| Roger Chen S1DUS*Altsu S1DUS*GáboR 「マァ」Sick [GD] Kaes B2マ Ayoub_MaRoC [MRc] gemini95 Teho | Ngottini [MRc]MegA RG^^2Rony RG^^3Mandula [MRc] Svinja Jaroslav Dohnalík Atian'' unmanned kurkku87 [WCL] T.Soini Beelo B2マ IVA kwintuspl [ATR] CAB€Z®N [MRc] Ricky 「マァ」Regis Ohnifus 「マァ」Pedro tomas Teho l yungtommyb Vesa @ YouTube Kode 「マァ」 TJ Lukas Jancik FromHell RobbeDoes
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 39:30.90 39:35.56 39:37.19 39:40.39 39:49.86 39:55.96 39:56.73 40:01.47 40:05.21 40:08.83 40:12.34 40:20.08 40:29.42 40:33.17 40:47.26 40:49.94 40:51.33 40:58.05 40:59.46 41:21.09 39:48.75 40:28.70 41:11.89 32:54.85 24:37.80 24:31.99 19:57.53 17:40.23 12:26.28 9:56.52 5:20.64 34:22.82 2:49.02
+ 4.66 + 6.29 + 9.49 + 18.96 + 25.06 + 25.83 + 30.57 + 34.31 + 37.93 + 41.44 + 49.18 + 58.52 + 1:02.27 + 1:16.36 + 1:19.04 + 1:20.43 + 1:27.15 + 1:28.56 + 1:50.19 + 1 Lap + 1 Lap + 1 Lap + 3 Laps† + 6 Laps† + 7 Laps† + 8 Laps† + 9 Laps† + 11 Laps† + 12 Laps† + 14 Laps† + 14 Laps† + 15 Laps†
100%: 2:25.17 101%: 2:26.62 103%: 2:29.52 105%: 2:32.42 107%: 2:35.33 >107%: >2:35.33 Pitstop Takeover Penalty Lap Rejoin
1 2:37.10 2:34.92 2:54.10 2:40.59 2:40.12 2:38.36 2:40.07 2:41.40 2:46.96 2:54.98 2:45.86 2:46.45 2:43.21 2:41.37 2:51.05 2:44.77 2:56.89 2:43.94 3:15.04 2:56.65 2:49.86 3:12.27 4:41.50 2:37.72 2:35.97 3:39.00 2:44.75 2:42.63 2:39.63 2:35.62 2:45.48 31:49.44 2:49.02
2 2:26.45 2:26.34 2:32.74 2:27.67 2:28.87 2:26.85 2:27.22 2:29.03 2:28.65 2:33.17 2:27.67 2:28.08 2:29.02 2:29.46 2:36.69 2:33.59 2:33.38 2:28.94 2:34.96 2:31.54 2:46.05 3:11.55 2:37.16 2:26.82 2:26.30 2:41.82 2:27.30 2:28.74 2:26.35 2:27.07 2:35.16 2:33.38  
3 2:26.69 2:26.28 2:27.17 2:26.40 2:26.89 2:27.02 2:26.42 2:27.32 2:43.77 2:29.29 2:27.23 2:31.07 2:29.22 2:28.01 2:29.71 2:30.39 2:31.36 2:36.22 2:28.63 2:32.63 2:31.37 2:37.25 3:40.05 2:26.75 2:27.97 2:48.06 2:28.00 2:28.74 2:26.17 2:27.01      
4 2:27.82 2:26.20 2:26.93 2:26.68 2:26.83 2:34.15 2:34.25 2:28.70 2:35.31 2:39.85 2:43.44 2:29.14 2:28.65 2:28.01 2:28.88 2:31.35 2:31.43 2:33.26 2:29.03 2:31.11 2:37.95 2:32.86 2:34.87 2:34.66 2:26.95 2:36.48 2:27.90 2:29.64 2:27.39 2:26.82      
5 2:26.87 2:26.29 2:26.49 2:26.41 2:28.39 2:26.60 2:28.18 2:29.19 2:28.01 2:29.61 2:32.31 2:27.78 2:28.34 2:29.38 2:28.26 2:34.85 2:30.78 2:34.45 2:28.89 2:30.19 2:32.18 2:30.83 2:29.33 2:26.49 2:28.20 2:33.38 2:27.58 2:29.99 2:26.74        
6 2:26.68 2:26.49 2:26.31 2:27.30 2:27.28 2:26.70 2:26.75 2:28.02 2:27.80 2:28.47 2:27.74 2:27.67 2:42.27 2:28.49 2:28.01 2:29.93 2:29.43 2:48.90 2:29.67 2:32.43 2:32.11 2:30.36 2:29.59 2:26.41 2:27.12 2:34.31 2:26.95 2:28.63          
7 2:26.37 2:26.28 2:26.46 2:26.28 2:29.32 2:26.72 2:26.60 2:27.43 2:28.80 2:28.09 2:27.64 2:50.02 2:28.79 2:31.99 2:28.01 2:29.77 2:29.92 2:33.73 2:39.02 2:31.15 2:31.46 2:32.91 2:29.45 2:26.92 2:26.69 2:33.85 2:27.03 2:31.86          
8 2:26.02 2:25.89 2:26.60 2:26.39 2:29.05 2:27.19 2:40.47 2:28.99 2:27.36 2:27.75 2:27.98 2:33.59 2:43.40 2:35.51 2:42.94 2:29.97 2:31.60 2:28.20 2:30.70 2:30.59 2:41.00 2:29.55 2:28.81 2:26.38 2:26.11 2:30.97 2:28.02            
9 2:25.90 2:25.90 2:26.08 2:26.16 2:26.83 2:31.80 2:40.90 2:27.39 2:29.03 2:27.15 2:27.15 2:27.35 2:33.17 2:28.39 2:33.43 2:31.28 2:29.15 2:28.23 2:29.99 2:30.67 2:42.84 2:30.14 2:29.38 3:12.47 2:26.08 2:34.12              
10 2:26.90 2:25.66 2:25.85 2:26.05 2:26.53 2:26.01 2:30.82 2:27.42 2:27.07 2:28.52 2:29.42 2:27.49 2:29.29 2:32.29 2:44.20 2:30.56 2:32.89 2:29.42 2:30.96 2:41.59 2:31.46 2:29.96 2:29.92 2:31.28 2:26.41                
11 2:40.74 2:25.55 2:26.04 2:27.07 2:26.55 2:26.18 2:26.30 2:27.28 2:26.95 2:26.98 2:27.71 2:28.11 2:29.39 2:29.01 2:33.78 2:29.90 2:29.48 2:38.86 2:30.67 2:30.89 2:32.53 2:35.24 2:34.69 2:26.36                  
12 2:30.73 2:25.71 2:25.82 2:42.54 2:26.55 2:26.22 2:25.97 2:27.92 2:27.28 2:27.20 2:27.19 2:28.92 2:29.12 2:29.20 2:28.31 2:29.64 2:29.68 2:30.08 2:30.47 2:31.17 2:33.58 2:29.74 2:33.66 2:26.44                  
13 2:25.47 2:25.73 2:26.45 2:31.24 2:26.74 2:26.50 2:25.80 2:27.80 2:27.43 2:27.06 2:40.20 2:28.23 2:28.30 2:31.86 2:27.73 2:30.37 2:28.98 2:35.15 2:30.32 2:30.86 2:32.03 2:32.33 2:28.51 2:26.15                  
14 2:26.17 2:25.61 2:27.32 2:27.69 2:27.39 2:41.94 2:25.56 2:43.15 2:26.77 2:27.13 2:27.28 2:28.77 2:28.02 2:47.31 2:28.87 2:29.98 2:43.08 2:29.69 2:30.16 2:29.70 2:58.47 2:39.59 2:28.66                    
15 2:25.66 2:40.38 2:25.65 2:25.57 2:40.49 2:34.59 2:26.25 2:32.64 2:26.34 2:26.69 2:26.87 2:28.89 2:28.30 2:33.78 2:28.45 2:46.72 2:34.66 2:28.20 2:30.48 2:30.21 2:55.86 3:34.12 2:36.31                    
16 2:25.33 2:42.33 2:27.18 2:26.35 2:32.03 2:29.13 2:25.17 2:27.79 2:27.68 2:26.89 2:26.65 2:28.52 2:30.93 2:29.11 2:28.94 2:36.87 2:28.62 2:30.78 2:30.47 2:29.71                          

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)