mpRes » League » [MRc] FBM Saturday » 2020 » Round 27 Racede | en

[MRc] FBM Saturday Season 2020 - Round 27 Race (replay) download
Version LfS 0.6U FBM BL2
Time 04.07.2020, 19:24:11
Distance 34 Laps (112.01 km)
Daytime Day
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
22 of 32 cars finished the race.
1 (±0) [MRc] gemini95 34 41:14.74 1 - 1:11.79 27 (1-19, 27-34) X X W
2 (+3) [FFM]^^6Strutter 34 + 11.22 1 - 1:11.83 7 (20-26) X X X W
3 (-1) S1DUS*GáboR 34 + 14.94 + 3.72 1 - 1:11.98 0 X X X M
4 (+2) AA™| Ro8er Chen 34 + 24.53 + 9.59 1 - 1:11.88 0 X X W
5 (+6) [MRc] Svinja 34 + 26.86 + 2.33 1 - 1:12.06 0 X X X M
6 (+1) mugen 34 + 28.02 + 1.16 1 - 1:11.99 0 X X X X M
7 (+6) EVR K. Piropo 34 + 30.44 + 2.42 1 - 1:12.19 0 X X W
8 (+8) RG^^3Mandula 34 + 34.53 + 4.09 1 - 1:12.24 0 X X W
9 (-1) /ATIAN'' 34 + 36.22 + 1.69 1 - 1:12.62 0 X X W
10 (+9) [MRc] Zesty 34 + 49.55 + 13.33 1 - 1:12.04 0 X X X X Ks
11 (-8) я R|JJD 34 + 51.17 + 1.62 1 - 1:12.54 0 X M
12 (+14) [WCL] J.A.Katila 34 + 51.32 + 0.15 1 - 1:12.88 0 X X W
13 (+5) Beelo 34 + 53.90 + 2.58 1 - 1:12.52 0 X X W
14 (-4) Dmitry Mareev 34 + 1:13.27 + 19.37 1 - 1:13.16 0 X X X Ks
15 (+5) Vesa @ YouTube 33 + 1 Lap + 1 Lap 1 - 1:13.04 0 X X W
16 (+8) kurkku87 33 + 1 Lap + 8.55 1 - 1:13.71 0 X X W
17 (+14) AA™| FireStarter 33 + 1 Lap + 0.85 1 - 1:13.19 0 X X M
18 (-3) [MRc] Leclerc 33 + 1 Lap + 1.79 1 - 1:12.99 0 X X M
19 (-7) AA™l Prasanth G29 33 + 1 Lap + 1.75 1 - 1:12.28 0 X X W
20 (+3) School Bus 33 + 1 Lap + 26.17 1 - 1:13.08 0 X X X M
21 (+6) Bumschnarsi 33 + 1 Lap + 15.10 1 - 1:14.01 0 X X W
22 (+7) [ATR] CAB€Z®N 32 + 2 Laps + 1 Lap 1 - 1:15.16 0 X X X W
23 (+7) Teodor 29 + 5 Laps† 3 - 1:14.83 0 X M
24 (-3) M4D5 20 + 14 Laps† 0 - 1:12.87 0 X X W
25 (±0) イムm®Jereloco 16 + 18 Laps† 2 - 1:13.51 0 X X X M
26 (+6) [MRc]botagas 13 + 21 Laps† 1 - 1:13.97 0 X X M
27 (-5) SEBAJOSE® 12 + 22 Laps† 1 DT (Speeding) 1:13.35 0 X X W
28 (-11) Lukas Jancik 10 + 24 Laps† 1 - 1:13.61 0 X X W
29 (-15) [MRc]Coloflow 5 + 29 Laps† 0 - 1:14.13 0 X X X Ks
30 (-2) Miklós 4 + 30 Laps† 0 - 1:14.96 0 X X X M
31 (-22) [GD] Kaes 2 + 32 Laps† 0 - 1:12.27 0 X M
32 (-28) [MRc] EmreKaan 0 + 34 Laps† 0 - 0.00 0 X X W

Pitstops

Name Lap Work Time [s] Total
27 cars made 30 pitstops with a total time of 3:37.67
/ATIAN'' 32 2_0_0 1.20 1.20
[WCL] J.A.Katila 23 2_0_0 1.21 1.21
[MRc] gemini95 20 2_0_0 1.21 1.21
kurkku87 30 2_0_0 1.21 1.21
AA™| FireStarter 30 2_0_0 1.21 1.21
RG^^3Mandula 13 2_0_0 1.21 1.21
я R|JJD 15 2_0_0 1.21 1.21
S1DUS*GáboR 22 2_0_0 1.21 1.21
EVR K. Piropo 25 2_0_0 1.21 1.21
[FFM]^^6Strutter 27 2_0_0 1.21 1.21
[MRc] Svinja 23 2_0_0 1.59 1.59
SEBAJOSE® 5 131074_0_0 1.74 1.74
Vesa @ YouTube 18 131074_0_0 2.37 2.37
mugen 18 131074_0_0 2.38 2.38
Beelo 6 131074_0_0 2.70 2.70
[MRc]botagas 11 514_3_0 4.92 4.92
イムm®Jereloco 13 2_0_0 1.21 5.44
15 10_8_0 4.23
School Bus 1 16386_0_0 7.21 7.21
[ATR] CAB€Z®N 17 131594_15_0 8.42 8.42
AA™| Ro8er Chen 14 131334_0_0 13.27 13.27
[MRc] Leclerc 17 262_0_0 13.49 13.49
Bumschnarsi 18 131598_15_0 14.32 14.32
Dmitry Mareev 17 131850_15_0 14.38 14.38
[MRc] Zesty 1 32774_0_0 19.21 19.21
AA™l Prasanth G29 15 147718_0_0 20.42 20.42
Lukas Jancik 10 148238_15_0 25.44 25.44
Teodor 13 163842_0_0 15.41 48.28
27 131854_15_0 21.55
29 147458_0_0 11.32

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
[GD] Kaes 1:30.29 131.35 2 0.00
M4D5 1:14.34 159.53 20 0.86
[MRc] Zesty 1:14.24 159.74 34 1.76
/ATIAN'' 1:13.85 160.59 34 1.82
[MRc] gemini95 1:12.79 162.94 34 1.87
[FFM]^^6Strutter 1:13.12 162.20 34 1.87
S1DUS*GáboR 1:13.23 161.96 34 1.96
[WCL] J.A.Katila 1:14.30 159.63 34 2.01
RG^^3Mandula 1:13.80 160.69 34 2.10
EVR K. Piropo 1:13.68 160.96 34 2.14
kurkku87 1:15.27 157.57 33 2.22
[MRc]Coloflow 1:16.46 155.10 5 2.26
[MRc] Svinja 1:13.58 161.19 34 2.28
mugen 1:13.61 161.11 34 2.40
Beelo 1:14.37 159.46 34 2.47
School Bus 1:16.19 155.65 33 2.72
Vesa @ YouTube 1:15.01 158.11 33 2.88
я R|JJD 1:14.29 159.63 34 3.21
AA™| FireStarter 1:15.29 157.52 33 3.42
SEBAJOSE® 1:16.15 155.74 12 3.49
[ATR] CAB€Z®N 1:17.60 152.83 32 3.90
Dmitry Mareev 1:14.94 158.25 34 3.91
AA™| Ro8er Chen 1:13.51 161.34 34 3.93
Bumschnarsi 1:16.65 154.73 33 4.39
Miklós 1:19.65 148.90 4 4.44
[MRc] Leclerc 1:15.35 157.40 33 4.59
AA™l Prasanth G29 1:15.40 157.29 33 6.25
イムm®Jereloco 1:18.94 150.23 16 7.52
Teodor 1:22.48 143.78 29 11.22
[MRc]botagas 1:20.28 147.74 13 11.39
Lukas Jancik 1:20.09 148.08 10 16.68

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 42.94
[MRc] gemini95 23.18 0.04 27 19.80 --- 30 42.98 28.81 1:11.79 --- 23
[FFM]^^6Strutter 23.15 0.01 29 19.85 0.05 32 43.00 28.83 1:11.83 0.04 32
AA™| Ro8er Chen 23.14 --- 33 19.90 0.10 32 43.04 28.84 1:11.88 0.09 29
S1DUS*GáboR 23.27 0.13 34 19.91 0.11 34 43.18 28.80 1:11.98 0.19 34
mugen 23.24 0.10 33 19.91 0.11 32 43.15 28.84 1:11.99 0.20 32
[MRc] Zesty 23.27 0.13 30 19.91 0.11 30 43.18 28.86 1:12.04 0.25 30
[MRc] Svinja 23.32 0.18 34 19.92 0.12 34 43.24 28.82 1:12.06 0.27 34
EVR K. Piropo 23.22 0.08 34 20.01 0.21 34 43.23 28.96 1:12.19 0.40 34
RG^^3Mandula 23.33 0.19 33 19.99 0.19 33 43.32 28.92 1:12.24 0.45 33
[GD] Kaes 23.30 0.16 3 19.97 0.17 2 43.27 29.00 1:12.27 0.48 2
AA™l Prasanth G29 23.25 0.11 33 19.96 0.16 30 43.21 29.07 1:12.28 0.49 33
Beelo 23.38 0.24 31 20.08 0.28 22 43.46 29.06 1:12.52 0.73 22
я R|JJD 23.37 0.23 3 20.12 0.32 31 43.49 29.05 1:12.54 0.75 31
/ATIAN'' 23.34 0.20 30 20.10 0.30 31 43.44 29.18 1:12.62 0.83 31
M4D5 23.40 0.26 19 20.17 0.37 16 43.57 29.30 1:12.87 1.08 17
[WCL] J.A.Katila 23.39 0.25 30 20.32 0.52 21 43.71 29.17 1:12.88 1.09 31
[MRc] Leclerc 23.54 0.40 3 20.21 0.41 33 43.75 29.24 1:12.99 1.20 26
Vesa @ YouTube 23.44 0.30 31 20.21 0.41 30 43.65 29.39 1:13.04 1.25 17
School Bus 23.45 0.31 30 20.34 0.54 24 43.79 29.29 1:13.08 1.29 30
Dmitry Mareev 23.50 0.36 4 20.33 0.53 10 43.83 29.33 1:13.16 1.37 11
AA™| FireStarter 23.53 0.39 15 20.28 0.48 19 43.81 29.38 1:13.19 1.40 7
SEBAJOSE® 23.53 0.39 7 20.38 0.58 8 43.91 29.44 1:13.35 1.56 11
イムm®Jereloco 23.67 0.53 5 20.62 0.82 5 44.29 29.22 1:13.51 1.72 5
Lukas Jancik 23.67 0.53 7 20.48 0.68 8 44.15 29.46 1:13.61 1.82 8
kurkku87 23.67 0.53 33 20.60 0.80 26 44.27 29.44 1:13.71 1.92 20
[MRc]botagas 23.67 0.53 4 20.49 0.69 5 44.16 29.81 1:13.97 2.18 10
Bumschnarsi 23.71 0.57 9 20.68 0.88 14 44.39 29.62 1:14.01 2.22 14
[MRc]Coloflow 23.80 0.66 6 20.46 0.66 3 44.26 29.87 1:14.13 2.34 3
Teodor 23.93 0.79 13 20.95 1.15 12 44.88 29.95 1:14.83 3.04 12
Miklós 24.12 0.98 3 20.91 1.11 2 45.03 29.93 1:14.96 3.17 2
[ATR] CAB€Z®N 23.99 0.85 17 20.97 1.17 7 44.96 30.20 1:15.16 3.37 29

Flags

Name Yellows Caused Blues Seen
18 cars caused 40 yellow and 12 cars got 142 blue flags.
[MRc] Zesty 1 0
я R|JJD 3 0
Beelo 1 0
Dmitry Mareev 0 3
Vesa @ YouTube 1 2
kurkku87 1 0
AA™| FireStarter 2 3
[MRc] Leclerc 1 6
AA™l Prasanth G29 1 29
School Bus 2 16
Bumschnarsi 1 17
[ATR] CAB€Z®N 0 26
Teodor 14 28
M4D5 1 0
イムm®Jereloco 2 2
[MRc]botagas 3 8
SEBAJOSE® 1 0
Lukas Jancik 2 2
Miklós 2 0
[GD] Kaes 1 0

Penalties

Name Lap Description
2 cars got a total of 2 penalties.
AA™l Prasanth G29 15 DT (Speeding)
17 DT Cleared
SEBAJOSE® 6 DT (Speeding)

Lap by Lap Analysis

Lap [MRc] gemini95 [FFM]^^6Strutter S1DUS*GáboR AA™| Ro8er Chen [MRc] Svinja mugen EVR K. Piropo RG^^3Mandula /ATIAN'' [MRc] Zesty я R|JJD [WCL] J.A.Katila Beelo Dmitry Mareev Vesa @ YouTube kurkku87 AA™| FireStarter [MRc] Leclerc AA™l Prasanth G29 School Bus Bumschnarsi [ATR] CAB€Z®N Teodor M4D5 イムm®Jereloco [MRc]botagas SEBAJOSE® Lukas Jancik [MRc]Coloflow Miklós [GD] Kaes [MRc] EmreKaan
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 41:14.74 41:25.96 41:29.68 41:39.27 41:41.60 41:42.76 41:45.18 41:49.27 41:50.96 42:04.29 42:05.91 42:06.06 42:08.64 42:28.01 41:15.20 41:23.75 41:24.60 41:26.39 41:28.14 41:54.31 42:09.41 41:23.24 39:52.06 24:46.78 21:03.10 17:23.58 15:13.78 13:20.90 6:22.31 5:18.60 3:00.58 0.00
+ 11.22 + 14.94 + 24.53 + 26.86 + 28.02 + 30.44 + 34.53 + 36.22 + 49.55 + 51.17 + 51.32 + 53.90 + 1:13.27 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 5 Laps† + 14 Laps† + 18 Laps† + 21 Laps† + 22 Laps† + 24 Laps† + 29 Laps† + 30 Laps† + 32 Laps† + 34 Laps†
100%: 1:11.79 101%: 1:12.50 103%: 1:13.94 105%: 1:15.37 107%: 1:16.81 >107%: >1:16.81 Pitstop Takeover Penalty Lap Rejoin
1 1:17.55 1:19.78 1:19.57 1:21.93 1:22.27 1:24.17 1:23.05 1:23.74 1:21.07 1:58.71 1:19.41 1:26.87 1:24.35 1:22.94 1:24.70 1:27.28 1:28.95 1:24.58 1:23.08 1:45.15 1:28.66 1:29.59 1:27.68 1:26.02 1:35.70 1:27.95 1:25.74 1:23.60 1:24.23 1:27.21 1:48.31  
2 1:12.30 1:13.06 1:12.84 1:13.43 1:13.25 1:14.80 1:13.87 1:13.73 1:14.22 1:18.58 1:13.92 1:13.75 1:14.80 1:14.96 1:15.64 1:14.59 1:14.20 1:14.96 1:13.38 1:19.73 1:15.86 1:16.15 1:16.48 1:14.51 1:14.31 1:14.62 1:14.16 1:15.01 1:14.44 1:14.96 1:12.27  
3 1:12.16 1:12.61 1:12.53 1:12.51 1:13.40 1:14.07 1:13.58 1:13.53 1:14.91 1:12.73 1:12.89 1:13.69 1:15.83 1:13.80 1:23.09 1:20.30 1:14.71 1:13.67 1:12.98 1:13.70 1:16.69 1:16.95 1:29.70 1:14.97 1:14.58 1:14.85 1:13.88 1:14.04 1:14.13 1:15.64    
4 1:12.29 1:12.54 1:12.43 1:12.28 1:12.85 1:12.70 1:13.51 1:13.27 1:13.47 1:12.52 1:12.81 1:13.62 1:13.27 1:14.77 1:14.05 1:14.73 1:17.30 1:13.56 1:12.74 1:13.53 1:14.54 1:16.03 1:16.75 1:13.29 1:14.28 1:14.88 1:13.99 1:13.92 1:14.82 1:20.79    
5 1:12.15 1:12.56 1:12.76 1:12.46 1:12.96 1:12.31 1:12.84 1:13.12 1:13.32 1:12.81 1:12.69 1:14.58 1:15.32 1:15.61 1:14.13 1:14.43 1:14.11 1:14.70 1:12.93 1:14.35 1:14.72 1:16.77 1:15.73 1:13.99 1:13.51 1:13.98 1:24.08 1:14.53 1:14.69      
6 1:12.33 1:12.74 1:12.81 1:12.62 1:12.75 1:13.31 1:13.88 1:13.74 1:13.25 1:12.67 1:12.92 1:14.71 1:24.93 1:13.97 1:13.63 1:14.87 1:13.57 1:13.56 1:12.96 1:13.89 1:14.60 1:15.76 1:15.99 1:13.55 1:14.62 1:14.52 1:19.33 1:14.48        
7 1:12.29 1:12.76 1:12.70 1:12.87 1:12.90 1:12.71 1:12.99 1:13.59 1:13.25 1:12.80 1:13.05 1:13.94 1:18.71 1:13.83 1:14.00 1:14.74 1:13.19 1:13.58 1:14.58 1:13.58 1:15.07 1:15.85 1:16.61 1:13.68 1:14.79 1:14.77 1:13.65 1:13.78        
8 1:12.24 1:12.62 1:12.73 1:12.71 1:12.85 1:13.35 1:13.11 1:13.10 1:13.75 1:13.64 1:13.72 1:13.40 1:13.20 1:13.98 1:13.62 1:14.21 1:13.43 1:13.47 1:12.77 1:14.74 1:14.37 1:16.22 1:15.56 1:14.08 1:14.50 1:14.79 1:13.42 1:13.61        
9 1:12.17 1:12.66 1:13.38 1:12.56 1:12.86 1:12.69 1:12.83 1:13.04 1:13.32 1:13.57 1:13.00 1:13.99 1:13.37 1:14.40 1:13.63 1:14.28 1:13.40 1:13.53 1:13.02 1:25.02 1:15.18 1:16.39 1:15.38 1:13.43 1:14.32 1:15.64 1:13.82 1:13.77        
10 1:12.42 1:12.72 1:12.93 1:12.36 1:12.74 1:12.89 1:12.87 1:13.40 1:13.51 1:12.79 1:13.13 1:13.58 1:13.02 1:13.39 1:14.07 1:14.29 1:13.21 1:14.11 1:16.95 1:14.53 1:14.45 1:15.91 1:16.38 1:13.62 1:14.23 1:13.97 1:13.75 2:04.16        
11 1:12.41 1:12.32 1:12.70 1:12.58 1:12.83 1:12.79 1:13.03 1:13.66 1:13.32 1:12.59 1:13.11 1:13.64 1:13.12 1:13.16 1:14.47 1:14.07 1:13.26 1:14.04 1:12.94 1:14.76 1:16.33 1:17.39 1:16.57 1:14.33 1:14.22 1:53.25 1:13.35          
12 1:12.32 1:12.74 1:12.59 1:14.07 1:12.85 1:12.56 1:13.18 1:12.92 1:13.45 1:13.00 1:12.89 1:13.13 1:13.64 1:13.50 1:13.78 1:14.27 1:13.64 1:13.97 1:12.91 1:15.64 1:17.09 1:15.56 1:14.83 1:13.88 1:14.44 1:26.89 1:14.61          
13 1:12.47 1:12.46 1:12.65 1:12.80 1:12.77 1:12.47 1:12.59 1:23.35 1:13.34 1:12.65 1:13.03 1:13.48 1:14.67 1:13.27 1:13.09 1:13.97 1:13.87 1:15.10 1:16.93 1:15.80 1:14.21 1:15.98 1:56.16 1:13.58 1:25.82 1:23.47            
14 1:12.54 1:12.58 1:12.60 1:34.39 1:12.66 1:12.46 1:12.67 1:18.86 1:13.59 1:12.53 1:12.66 1:13.37 1:13.20 1:13.23 1:13.50 1:14.08 1:13.24 1:14.29 1:12.91 1:14.88 1:14.01 1:15.49 1:22.39 1:14.25 1:19.80              
15 1:12.10 1:12.45 1:12.62 1:17.66 1:12.85 1:12.38 1:13.06 1:12.99 1:13.27 1:12.47 1:22.94 1:13.59 1:13.46 1:14.26 1:15.32 1:14.42 1:13.29 1:14.70 1:42.35 1:15.44 1:15.02 1:15.70 1:16.27 1:14.33 1:41.23              
16 1:12.21 1:12.36 1:12.48 1:12.27 1:12.63 1:12.43 1:12.81 1:12.86 1:12.91 1:12.57 1:18.18 1:13.92 1:13.81 1:13.65 1:13.12 1:14.02 1:13.26 1:13.48 1:24.63 1:13.65 1:14.13 1:15.65 1:27.08 1:12.93 1:22.75              
17 1:12.18 1:12.41 1:12.43 1:12.44 1:12.57 1:14.00 1:13.14 1:12.63 1:13.08 1:14.09 1:13.20 1:13.19 1:13.10 1:35.52 1:13.04 1:14.32 1:13.30 1:38.31 1:18.99 1:13.62 1:15.01 1:36.26 1:16.12 1:12.87                
18 1:12.18 1:12.27 1:12.43 1:12.57 1:12.53 1:24.98 1:12.81 1:13.38 1:13.09 1:12.36 1:12.88 1:12.96 1:13.60 1:19.46 1:26.05 1:14.07 1:13.88 1:18.88 1:12.51 1:17.79 1:39.01 1:22.49 1:18.34 1:13.23                
19 1:12.15 1:12.45 1:12.54 1:12.28 1:12.76 1:17.71 1:12.62 1:12.84 1:13.13 1:12.67 1:12.94 1:13.31 1:12.97 1:13.48 1:19.32 1:14.01 1:13.59 1:13.34 1:13.48 1:13.56 1:21.36 1:15.43 1:15.74 1:13.03                
20 1:21.80 1:12.26 1:12.59 1:12.40 1:12.74 1:12.46 1:12.86 1:12.99 1:12.79 1:12.51 1:12.63 1:12.97 1:13.41 1:13.43 1:13.67 1:13.71 1:13.96 1:13.59 1:12.52 1:16.90 1:17.89 1:21.04 1:15.88 1:13.21                
21 1:17.10 1:12.41 1:12.33 1:12.30 1:12.62 1:14.86 1:12.91 1:12.78 1:13.01 1:12.42 1:12.90 1:13.37 1:12.98 1:13.86 1:13.44 1:13.96 1:13.62 1:15.52 1:12.94 1:13.63 1:16.86 1:16.12 1:15.22                  
22 1:11.85 1:12.32 1:22.43 1:12.13 1:12.74 1:12.56 1:12.43 1:12.74 1:13.13 1:12.52 1:13.35 1:13.13 1:12.52 1:13.52 1:13.31 1:13.93 1:13.33 1:13.83 1:12.69 1:17.09 1:14.43 1:19.43 1:16.79                  
23 1:11.79 1:12.33 1:17.99 1:12.17 1:24.13 1:12.24 1:12.56 1:12.81 1:13.07 1:12.60 1:12.89 1:23.20 1:13.19 1:13.28 1:13.39 1:14.30 1:20.35 1:13.62 1:12.62 1:17.32 1:15.59 1:15.85 1:32.28                  
24 1:12.42 1:12.16 1:12.52 1:12.29 1:18.94 1:12.29 1:13.67 1:13.06 1:13.31 1:12.68 1:13.49 1:19.00 1:12.72 1:13.61 1:13.98 1:14.13 1:27.99 1:13.87 1:13.66 1:14.03 1:15.94 1:15.61 1:27.71                  
25 1:12.23 1:12.22 1:12.36 1:12.24 1:14.03 1:12.07 1:23.71 1:12.83 1:12.94 1:12.61 1:14.42 1:13.29 1:12.57 1:13.35 1:13.39 1:13.94 1:13.57 1:13.49 1:13.21 1:13.43 1:15.36 1:16.13 1:17.76                  
26 1:11.94 1:12.28 1:12.54 1:12.28 1:12.31 1:12.53 1:18.32 1:13.01 1:12.94 1:12.70 1:12.91 1:12.89 1:12.53 1:13.55 1:13.24 1:13.81 1:13.29 1:12.99 1:12.35 1:13.79 1:15.82 1:16.05 1:18.14                  
27 1:12.15 1:21.64 1:12.46 1:12.33 1:12.68 1:12.25 1:12.45 1:12.79 1:12.83 1:12.50 1:12.90 1:13.67 1:13.39 1:13.55 1:13.61 1:13.99 1:13.40 1:21.83 1:29.94 1:13.73 1:15.62 1:16.28 1:46.40                  
28 1:12.10 1:17.97 1:12.23 1:12.20 1:12.40 1:12.35 1:12.41 1:12.87 1:12.66 1:13.22 1:13.00 1:13.27 1:13.61 1:14.21 1:13.71 1:13.95 1:13.27 1:13.25 1:12.78 1:13.35 1:14.97 1:17.36 1:21.96                  
29 1:11.98 1:12.03 1:12.32 1:11.88 1:12.30 1:12.79 1:12.53 1:12.61 1:12.81 1:12.23 1:13.12 1:12.93 1:13.43 1:13.85 1:13.81 1:14.27 1:13.63 1:13.50 1:12.78 1:20.20 1:15.28 1:15.16 1:50.16                  
30 1:11.89 1:12.31 1:12.95 1:12.02 1:12.39 1:12.63 1:12.66 1:13.19 1:12.64 1:12.04 1:13.37 1:12.89 1:12.61 1:13.76 1:13.75 1:24.06 1:23.97 1:14.03 1:12.31 1:13.08 1:15.46 1:15.79                    
31 1:11.81 1:12.21 1:12.04 1:12.17 1:12.35 1:12.20 1:12.50 1:12.44 1:12.62 1:12.51 1:12.54 1:12.88 1:12.59 1:13.99 1:13.70 1:19.28 1:19.11 1:13.44 1:12.62 1:16.58 1:15.47 1:16.25                    
32 1:12.35 1:11.83 1:12.37 1:11.96 1:14.31 1:11.99 1:13.30 1:12.57 1:22.20 1:12.48 1:28.13 1:13.47 1:13.15 1:14.07 1:13.99 1:14.04 1:13.34 1:13.22 1:12.40 1:13.56 1:15.83 1:16.60                    
33 1:12.00 1:12.62 1:12.85 1:11.96 1:12.32 1:12.15 1:12.24 1:12.24 1:18.03 1:12.24 1:14.93 1:13.02 1:12.92 1:15.00 1:15.96 1:15.43 1:14.37 1:14.38 1:12.28 1:14.26 1:14.58                      
34 1:12.87 1:13.28 1:11.98 1:12.15 1:12.06 1:12.61 1:12.19 1:12.59 1:12.73 1:13.28 1:15.96 1:13.36 1:18.65 1:13.80                                    

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)