mpRes » League » [MRc] FBM Saturday » 2020 » Round 38 Racede | en

[MRc] FBM Saturday Season 2020 - Round 38 Race (replay) download
Version LfS 0.6U FBM SO3R
Time 19.09.2020, 19:19:36
Distance 65 Laps (86.69 km)
Daytime Afternoon
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
15 of 26 cars finished the race.
1 (±0) Teho | Rudolfa 65 39:11.44 1 - 35.65 65 (1-65) X X W
2 (+2) [GD] Kaes 65 + 4.99 1 - 35.72 0 X M
3 (+5) fnc. B.Botev 65 + 15.18 + 10.19 1 - 35.73 0 X X W
4 (+1) RG^^3Mandula 65 + 15.59 + 0.41 1 - 35.78 0 X X W
5 (-2) [MRc]StepanYL 65 + 32.21 + 16.62 1 - 35.83 0 X X X X M
6 (±0) [FFM]^^6Strutter 64 + 1 Lap + 1 Lap 1 - 36.01 0 X X X W
7 (±0) [MRc] EmreKaan 64 + 1 Lap + 0.14 1 - 36.00 0 X X M
8 (+1) /ATIAN'' 64 + 1 Lap + 6.30 1 - 36.13 0 X X W
9 (+4) Beelo 64 + 1 Lap + 1.60 1 - 35.96 0 X X W
10 (+9) GenR uNite 64 + 1 Lap + 22.61 2 - 36.05 0 X W
11 (+4) チαtαssッ 64 + 1 Lap + 0.72 1 - 36.16 0 X X W
12 (+4) B2マ IVA 64 + 1 Lap + 0.90 1 - 36.36 0 X X W
13 (+7) [MRc] Svinja 63 + 2 Laps + 1 Lap 1 - 36.53 0 X X X M
14 (-4) [MRc] Talha 62 + 3 Laps + 1 Lap 1 - 36.12 0 X X X M
15 (+8) kurkku87 58 + 7 Laps + 4 Laps 2 - 36.71 0 X X X Ks
16 (-4) Lukáš Jančík 54 + 11 Laps† 1 - 36.24 0 X X W
17 (+5) Gary 29 + 36 Laps† 0 - 37.43 0 X X W
18 (-16) TRR. yungtommyb 24 + 41 Laps† 0 - 35.90 0 X X M
19 (+5) dering 23 + 42 Laps† 1 - 37.24 0 X X W
20 (-9) Iron|Doni 20 + 45 Laps† 1 - 36.14 0 X X W
21 (+5) [BG]Rosen 18 + 47 Laps† 1 - 38.06 0 X X W
22 (-4) [MRc] Dario™ 17 + 48 Laps† 1 - 36.71 0 X X W
23 (-2) [ATR] CAB€Z®N 9 + 56 Laps† 0 - 38.28 0 X X W
24 (+1) T4tu 5 + 60 Laps† 1 - 38.85 0 X X X X Ks
25 (-8) aarcijs 1 + 64 Laps† 0 - 46.90 0 X X X W
26 (-12) [GD] Urus™ 0 + 65 Laps† 0 - 0.00 0 X X X X M

Pitstops

Name Lap Work Time [s] Total
21 cars made 23 pitstops with a total time of 3:27.92
Teho | Rudolfa 45 2_0_0 1.20 1.20
[FFM]^^6Strutter 14 2_0_0 1.20 1.20
fnc. B.Botev 48 2_0_0 1.20 1.20
[GD] Kaes 43 2_0_0 1.20 1.20
/ATIAN'' 57 2_0_0 1.21 1.21
チαtαssッ 1 2_0_0 1.21 1.21
RG^^3Mandula 36 2_0_0 1.21 1.21
[MRc]StepanYL 49 2_0_0 1.21 1.21
[MRc] EmreKaan 27 131074_0_0 1.37 1.37
[MRc] Svinja 57 2_0_0 1.57 1.57
B2マ IVA 4 2_0_0 1.64 1.64
Beelo 26 131074_0_0 2.21 2.21
Iron|Doni 11 522_15_0 7.21 7.21
Lukáš Jančík 32 522_15_0 7.21 7.21
[MRc] Dario™ 14 262_0_0 13.21 13.21
GenR uNite 2 2_0_0 1.20 14.40
15 262_0_0 13.20
dering 17 131854_15_0 21.81 21.81
[BG]Rosen 9 33030_0_0 25.24 25.24
[MRc] Talha 4 33030_0_0 25.56 25.56
T4tu 5 164102_0_0 26.42 26.42
kurkku87 2 16646_0_0 19.21 50.43
23 33550_15_0 31.22

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
aarcijs 46.90 102.37 1 0.00
TRR. yungtommyb 36.56 131.34 24 0.34
[GD] Kaes 36.25 132.44 65 0.77
/ATIAN'' 36.89 130.15 64 0.80
fnc. B.Botev 36.41 131.87 65 0.81
[MRc] EmreKaan 36.79 130.49 64 0.84
Teho | Rudolfa 36.18 132.72 65 0.85
RG^^3Mandula 36.42 131.85 65 0.85
[MRc]StepanYL 36.67 130.93 65 0.88
[FFM]^^6Strutter 36.79 130.50 64 0.98
Beelo 36.92 130.06 64 1.03
B2マ IVA 37.30 128.74 64 1.16
[ATR] CAB€Z®N 40.09 119.76 9 1.33
チαtαssッ 37.28 128.79 64 1.52
[MRc] Svinja 37.92 126.62 63 1.74
Lukáš Jančík 37.59 127.74 54 1.95
GenR uNite 37.27 128.83 64 2.56
Gary 40.54 118.44 29 2.67
[MRc] Talha 38.02 126.27 62 4.62
Iron|Doni 38.26 125.49 20 5.04
dering 40.09 119.78 23 5.79
[MRc] Dario™ 40.18 119.51 17 6.39
kurkku87 40.88 117.46 58 7.55
[BG]Rosen 44.09 108.89 18 8.40
T4tu 49.28 97.44 5 17.81

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 35.57
Teho | Rudolfa 14.91 --- 63 20.67 0.01 52 35.58 0.07 35.65 --- 52
[GD] Kaes 14.96 0.05 52 20.66 --- 63 35.62 0.10 35.72 0.07 47
fnc. B.Botev 15.01 0.10 47 20.66 --- 59 35.67 0.06 35.73 0.08 59
RG^^3Mandula 15.00 0.09 59 20.69 0.03 7 35.69 0.09 35.78 0.13 55
[MRc]StepanYL 14.98 0.07 60 20.67 0.01 38 35.65 0.18 35.83 0.18 38
TRR. yungtommyb 15.08 0.17 12 20.82 0.16 12 35.90 --- 35.90 0.25 12
Beelo 15.10 0.19 63 20.85 0.19 49 35.95 0.01 35.96 0.31 49
[MRc] EmreKaan 14.94 0.03 55 20.87 0.21 11 35.81 0.19 36.00 0.35 53
[FFM]^^6Strutter 15.06 0.15 53 20.80 0.14 36 35.86 0.15 36.01 0.36 36
GenR uNite 15.07 0.16 47 20.82 0.16 49 35.89 0.16 36.05 0.40 53
[MRc] Talha 15.09 0.18 42 21.03 0.37 42 36.12 --- 36.12 0.47 42
/ATIAN'' 15.12 0.21 38 20.88 0.22 52 36.00 0.13 36.13 0.48 52
Iron|Doni 15.24 0.33 8 20.86 0.20 18 36.10 0.04 36.14 0.49 18
チαtαssッ 15.07 0.16 51 20.98 0.32 58 36.05 0.11 36.16 0.51 58
Lukáš Jančík 15.13 0.22 10 21.02 0.36 6 36.15 0.09 36.24 0.59 6
B2マ IVA 15.17 0.26 63 21.14 0.48 33 36.31 0.05 36.36 0.71 33
[MRc] Svinja 15.18 0.27 22 21.17 0.51 25 36.35 0.18 36.53 0.88 25
[MRc] Dario™ 15.31 0.40 6 21.27 0.61 11 36.58 0.13 36.71 1.06 8
kurkku87 15.39 0.48 32 21.32 0.66 35 36.71 --- 36.71 1.06 35
dering 15.61 0.70 7 21.45 0.79 22 37.06 0.18 37.24 1.59 3
Gary 15.47 0.56 16 21.86 1.20 10 37.33 0.10 37.43 1.78 10
[BG]Rosen 15.68 0.77 3 22.24 1.58 15 37.92 0.14 38.06 2.41 3
[ATR] CAB€Z®N 15.78 0.87 5 22.28 1.62 1 38.06 0.22 38.28 2.63 5
T4tu 15.76 0.85 5 22.72 2.06 1 38.48 0.37 38.85 3.20 2
aarcijs 15.56 0.65 2 22.04 1.38 1 37.60 9.30 46.90 11.25 1

Flags

Name Yellows Caused Blues Seen
17 cars caused 49 yellow and 16 cars got 223 blue flags.
[MRc]StepanYL 2 0
[FFM]^^6Strutter 0 6
[MRc] EmreKaan 1 1
/ATIAN'' 1 2
Beelo 0 8
GenR uNite 2 3
チαtαssッ 1 5
B2マ IVA 0 13
[MRc] Svinja 1 18
[MRc] Talha 3 39
kurkku87 9 54
Lukáš Jančík 1 12
Gary 3 27
TRR. yungtommyb 1 0
dering 5 13
Iron|Doni 4 3
[BG]Rosen 7 13
[MRc] Dario™ 5 6
T4tu 1 0
[GD] Urus™ 2 0

Lap by Lap Analysis

Lap Teho | Rudolfa [GD] Kaes fnc. B.Botev RG^^3Mandula [MRc]StepanYL [FFM]^^6Strutter [MRc] EmreKaan /ATIAN'' Beelo GenR uNite チαtαssッ B2マ IVA [MRc] Svinja [MRc] Talha kurkku87 Lukáš Jančík Gary TRR. yungtommyb dering Iron|Doni [BG]Rosen [MRc] Dario™ [ATR] CAB€Z®N T4tu aarcijs [GD] Urus™
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 39:11.44 39:16.43 39:26.62 39:27.03 39:43.65 39:14.65 39:14.79 39:21.09 39:22.69 39:45.30 39:46.02 39:46.92 39:49.00 39:17.49 39:30.83 33:49.63 19:35.58 14:37.33 15:21.96 12:45.23 13:13.68 11:22.99 6:00.83 4:06.38 46.90 0.00
+ 4.99 + 15.18 + 15.59 + 32.21 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 3 Laps + 7 Laps + 11 Laps† + 36 Laps† + 41 Laps† + 42 Laps† + 45 Laps† + 47 Laps† + 48 Laps† + 56 Laps† + 60 Laps† + 64 Laps† + 65 Laps†
100%: 35.65 101%: 36.01 103%: 36.72 105%: 37.43 107%: 38.15 >107%: >38.15 Pitstop Takeover Penalty Lap Rejoin
1 39.40 40.88 43.25 42.94 40.57 42.69 43.81 44.14 45.10 46.01 51.10 46.21 47.42 52.10 51.62 44.70 50.45 40.43 47.93 44.74 51.90 45.54 48.90 49.58 46.90  
2 36.22 36.94 36.45 36.49 36.99 36.43 36.33 36.71 37.77 42.78 39.35 37.48 37.55 37.69 1:08.57 37.01 38.78 36.85 37.33 37.76 42.00 37.81 38.64 38.85    
3 36.31 36.53 36.23 36.22 36.42 36.21 36.24 36.60 36.55 38.70 38.27 37.13 36.81 39.00 41.84 37.16 41.01 36.46 37.24 37.40 38.06 37.29 38.90 38.99    
4 35.96 36.33 36.73 36.75 36.34 36.84 36.58 36.51 36.33 38.94 37.90 45.05 37.03 1:12.59 38.07 36.52 38.82 36.17 38.10 36.73 39.65 36.93 39.70 43.22    
5 35.81 36.41 36.84 36.43 36.32 36.54 37.24 36.53 36.42 37.05 38.11 39.01 36.86 38.02 39.01 36.41 37.82 36.13 37.83 36.83 48.12 36.82 38.28 1:15.74    
6 36.03 36.14 36.40 35.99 36.20 37.00 36.51 36.70 36.26 36.74 36.68 37.08 36.83 37.01 41.23 36.24 37.73 36.53 37.33 36.60 49.82 36.81 39.71      
7 36.31 36.05 36.34 35.85 36.14 37.03 36.34 36.48 36.76 36.46 37.29 37.19 37.22 37.71 38.33 36.38 38.21 36.10 37.94 36.58 39.41 37.16 38.58      
8 35.86 36.47 36.11 36.21 36.44 36.25 36.40 36.54 36.42 36.43 36.71 36.87 36.70 37.37 38.37 36.52 38.38 36.31 37.74 36.46 55.72 36.71 38.37      
9 36.14 36.17 36.06 35.93 36.01 36.51 36.50 36.46 36.43 37.35 36.97 37.02 36.83 36.80 38.42 36.87 38.84 36.12 37.76 36.58 1:10.14 37.00 39.75      
10 36.03 36.06 36.01 35.91 36.23 36.51 36.95 36.84 36.74 37.05 36.51 37.42 36.76 36.83 38.28 36.54 37.43 36.31 38.11 36.52 42.17 37.13        
11 36.19 36.39 35.96 36.03 36.32 36.68 36.03 36.66 36.76 37.10 37.06 36.91 37.05 36.75 38.48 36.84 38.06 36.27 40.50 58.54 42.25 36.91        
12 35.98 36.15 36.03 36.26 36.77 37.69 37.58 36.83 36.69 36.49 36.50 37.05 36.91 38.06 46.23 36.48 40.04 35.90 38.53 38.67 41.71 37.09        
13 36.54 36.49 36.31 36.75 36.65 39.27 37.16 37.07 37.02 36.43 36.66 36.92 36.77 36.83 37.20 37.45 41.37 36.66 37.66 36.46 38.83 37.12        
14 36.14 36.62 36.31 36.72 36.73 43.08 36.73 36.77 37.02 36.42 36.49 36.90 37.25 36.73 43.20 36.77 37.73 36.44 38.07 36.44 38.46 55.66        
15 36.12 36.20 36.22 36.20 36.24 38.45 36.42 36.56 36.79 54.29 36.41 36.83 37.52 36.72 38.81 36.94 43.47 36.08 37.95 36.23 38.18 38.65        
16 36.15 36.03 36.36 36.35 37.14 36.58 36.38 36.67 38.72 37.54 36.62 37.45 38.06 36.62 38.11 36.85 38.25 36.38 45.57 36.43 38.21 55.95        
17 36.09 36.21 36.58 36.03 37.42 37.15 36.54 36.89 36.48 36.35 36.31 36.47 38.13 36.68 37.91 36.50 38.38 36.37 1:04.17 36.61 39.53 42.41        
18 35.96 36.16 35.91 35.88 36.41 36.92 36.16 37.01 36.39 37.13 36.57 36.87 37.14 37.05 40.50 37.34 37.98 36.35 38.64 36.14 39.52          
19 36.54 36.14 35.97 36.11 37.45 36.90 37.27 37.21 36.39 36.44 37.26 37.43 36.86 36.77 39.65 36.85 44.22 36.23 37.57 36.62            
20 36.10 36.50 36.02 36.17 36.67 36.62 36.27 37.07 36.93 36.20 36.74 36.57 37.33 37.29 53.71 36.88 39.45 36.37 39.79 36.89            
21 35.89 36.31 36.11 36.18 36.22 36.30 36.15 36.93 36.53 36.70 36.92 36.91 36.84 40.75 38.93 36.75 40.87 36.44 37.44              
22 35.95 36.36 36.26 36.69 37.38 36.66 36.86 36.96 36.67 36.39 36.47 38.03 36.75 36.68 38.91 36.92 37.90 36.98 37.37              
23 36.17 36.13 37.95 37.96 36.35 36.64 36.44 36.51 36.88 36.67 36.24 36.67 36.60 36.49 1:24.88 36.71 42.43 37.11 41.39              
24 35.95 35.96 35.98 35.86 36.22 36.61 36.93 36.82 36.56 37.03 36.54 36.59 36.70 37.02 37.81 36.54 41.27 36.34                
25 35.96 35.96 36.86 38.20 36.81 36.42 36.65 36.98 37.02 37.23 36.18 36.56 36.53 36.55 37.92 37.26 39.19                  
26 36.03 35.96 36.10 36.41 36.81 36.34 36.51 37.36 43.74 36.27 36.59 36.75 37.13 36.79 40.55 37.21 43.11                  
27 36.07 36.36 36.37 35.92 36.22 36.23 42.23 36.48 37.59 36.08 40.38 36.57 37.67 36.75 38.81 37.46 42.54                  
28 35.81 35.87 36.07 36.00 36.10 36.15 38.35 36.53 36.34 36.39 36.45 36.68 38.05 36.94 38.95 36.72 48.37                  
29 35.91 35.87 36.23 36.18 35.96 36.41 36.36 37.16 37.07 36.24 36.96 37.07 38.28 36.98 39.38 36.73 43.48                  
30 36.18 36.00 36.05 36.00 36.24 36.33 36.60 37.07 36.38 36.48 36.85 37.42 36.98 36.77 38.00 36.78                    
31 35.87 36.30 36.34 36.29 36.38 37.04 36.64 36.50 36.45 36.28 36.96 36.85 36.63 36.74 39.09 36.56                    
32 35.79 36.13 36.27 36.17 36.86 36.32 36.38 36.49 36.76 36.44 36.57 36.67 36.81 36.69 38.49 49.99                    
33 36.12 36.07 36.10 36.07 36.67 36.25 36.37 36.55 36.93 36.16 36.40 36.36 36.74 36.61 37.83 38.64                    
34 35.86 35.95 36.17 36.03 36.32 36.30 36.05 36.56 37.77 36.81 38.40 36.81 38.79 38.04 37.76 37.32                    
35 36.16 36.12 36.11 36.15 36.69 36.42 36.23 36.45 36.50 36.30 47.26 37.47 38.57 36.89 36.71 37.91                    
36 35.84 35.84 37.23 41.99 36.18 36.01 36.71 36.71 36.70 36.25 37.65 37.74 38.04 37.15 37.68 37.74                    
37 35.83 36.02 36.45 36.71 36.47 36.09 36.57 36.30 36.22 37.31 36.59 38.56 40.34 36.31 38.34 39.03                    
38 36.09 36.03 36.78 36.12 35.83 36.46 36.30 36.19 36.73 36.27 36.68 37.92 40.66 36.44 39.97 37.23                    
39 36.06 35.92 36.04 36.21 36.27 36.28 36.23 36.59 36.62 36.28 37.57 37.03 37.84 36.23 42.29 38.38                    
40 36.11 35.88 36.34 36.79 36.47 36.09 36.45 36.59 36.50 36.98 36.71 38.85 38.77 36.37 37.35 37.11                    
41 35.83 35.85 35.87 36.24 36.51 36.42 36.30 36.36 36.38 43.71 36.41 37.01 40.98 36.65 40.90 37.73                    
42 36.15 35.86 36.08 35.87 36.17 36.70 36.48 36.71 36.64 36.48 36.38 36.58 39.84 36.12 37.70 36.84                    
43 35.92 41.87 36.01 35.90 36.16 36.91 36.49 36.41 36.54 36.26 36.43 36.89 39.59 36.97 38.96 36.81                    
44 36.14 36.99 35.92 35.91 35.96 36.94 36.54 36.54 36.56 36.31 36.30 36.73 36.62 39.19 37.43 37.71                    
45 42.52 35.93 35.88 36.12 36.29 36.52 36.90 36.81 36.53 36.21 37.48 36.74 36.79 36.92 37.94 37.40                    
46 37.49 35.99 35.89 36.12 36.09 36.06 36.61 36.55 36.57 36.09 37.71 36.74 36.62 37.34 41.02 37.15                    
47 36.03 35.72 35.75 36.35 36.31 36.47 37.14 36.54 37.83 36.09 36.62 36.49 36.63 37.41 37.57 37.15                    
48 36.16 36.07 41.81 36.47 37.19 36.31 36.27 36.60 36.26 37.57 37.07 36.82 37.67 37.25 37.88 38.00                    
49 35.78 35.91 37.15 36.79 41.65 36.45 36.39 36.46 35.96 36.80 36.58 36.86 38.99 37.20 37.43 38.31                    
50 35.72 36.00 35.94 36.37 37.48 36.49 36.28 36.38 36.15 36.06 36.34 36.57 39.88 36.89 38.96 36.60                    
51 36.02 35.90 36.26 36.13 36.36 36.35 36.66 36.39 36.34 36.37 36.25 37.07 36.70 37.99 37.92 37.13                    
52 35.65 35.87 36.81 36.00 35.96 36.34 36.30 36.13 36.26 36.25 36.48 36.95 36.81 36.86 41.05 36.65                    
53 35.75 35.79 36.18 36.18 36.41 36.07 36.00 36.51 36.66 36.05 36.28 36.62 37.61 37.24 38.68 41.25                    
54 35.80 35.88 35.84 36.12 36.55 36.41 36.39 36.48 38.24 36.26 36.60 36.84 37.64 39.73 41.37 38.66                    
55 35.70 36.03 35.90 35.78 36.04 36.42 37.89 39.45 36.45 37.30 37.35 37.47 37.12 37.34 38.39                      
56 35.82 35.88 35.97 35.95 36.58 36.51 37.49 36.76 36.51 36.86 36.68 36.77 36.71 36.96 41.21                      
57 35.79 35.93 36.19 36.19 36.58 36.27 36.45 41.93 36.19 36.83 36.89 36.47 46.91 37.01 39.74                      
58 36.00 35.77 35.92 35.94 36.85 36.27 37.15 37.42 36.42 36.31 36.16 36.46 38.42 36.78 39.49                      
59 35.96 35.77 35.73 35.83 36.02 36.48 36.30 36.37 36.27 36.08 37.03 36.72 36.67 36.84                        
60 35.90 35.83 35.73 35.85 36.58 36.58 36.14 36.37 36.24 36.31 36.78 37.15 36.84 39.68                        
61 36.09 35.87 35.96 35.89 36.89 36.96 36.28 36.36 36.14 36.42 37.00 36.70 36.71 37.13                        
62 36.02 36.14 35.92 35.78 36.32 36.16 36.38 36.52 36.51 36.13 36.16 37.66 36.92 38.18                        
63 35.94 35.75 35.92 35.94 36.38 36.68 36.86 36.43 36.41 36.32 36.37 36.44 42.58                          
64 35.90 35.93 36.27 36.22 36.24 37.18 36.65 36.63 36.70 37.77 36.79 36.80                            
65 35.83 35.99 35.82 35.94 40.17                                          

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)