mpRes » League » [MRc] FBM Saturday » 2020 » Round 47 Racede | en

[MRc] FBM Saturday Season 2020 - Round 47 Race (replay) download
Version LfS 0.6U FBM KY2R
Time 21.11.2020, 20:27:03
Distance 23 Laps (118.17 km)
Daytime Day
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
26 of 38 cars finished the race.
1 (+4) RG^^3Mandula 23 41:24.28 1 - 1:45.96 23 (1-23) X X W
2 (±0) [GD] Kaes 23 + 4.00 1 - 1:45.84 0 X X M
3 (+6) [FFM]^^6Strutter 23 + 4.67 + 0.67 1 - 1:45.58 0 X X X W
4 (-1) [MRc] Zesty 23 + 8.36 + 3.69 1 - 1:45.72 0 X X W
5 (+6) EVR A. Araújo 23 + 8.60 + 0.24 1 - 1:45.95 0 X X W
6 (±0) [MRc] EmreKaan 23 + 11.55 + 2.95 1 - 1:46.15 0 X X M
7 (+3) 221. Fantom 23 + 19.14 + 7.59 1 - 1:45.97 0 X X W
8 (+4) /ATIAN'' 23 + 27.41 + 8.27 1 - 1:46.75 0 X X W
9 (+5) [MRc]KIG 23 + 27.87 + 0.46 1 - 1:46.58 0 X X M
10 (+23) 「マァ」Paulo 23 + 31.57 + 3.70 1 - 1:46.28 0 X X W
11 (-3) SEBAJOSE® 23 + 43.50 + 11.93 1 - 1:46.54 0 X X X W
12 (-5) [MRc] Talha 23 + 1:00.48 + 16.98 1 - 1:46.49 0 X X X M
13 (+3) Woupat 23 + 1:09.41 + 8.93 1 - 1:47.06 0 X X W
14 (+9) Lukáš Jančík 23 + 1:17.86 + 8.45 1 - 1:48.32 0 X W
15 (+5) kurkku87 23 + 1:18.41 + 0.55 1 - 1:48.02 0 X X W
16 (+2) Kimi7 23 + 1:28.16 + 9.75 1 - 1:48.82 0 X X W
17 (-2) aarcijs 23 + 1:43.62 + 15.46 1 - 1:48.09 0 X X X W
18 (+17) [MRc] Ricky 23 + 1:47.48 + 3.86 1 - 1:47.95 0 X X X X M
19 (±0) Oruzak 22 + 1 Lap + 1 Lap 1 - 1:48.82 0 X X W
20 (+14) Bumschnarsi 22 + 1 Lap + 2.14 1 - 1:49.07 0 X X W
21 (+1) Felipe S. 22 + 1 Lap + 1.22 1 - 1:47.35 0 X W
22 (-1) 13.Rydzu 22 + 1 Lap + 24.02 2 - 1:48.23 0 X X X X M
23 (+3) BlackViper 22 + 1 Lap + 0.59 1 - 1:48.58 0 X X W
24 (±0) jj 22 + 1 Lap + 8.79 1 - 1:48.26 0 X X X X M
25 (±0) Math_55 22 + 1 Lap + 17.62 1 - 1:48.33 0 X X W
26 (+1) Kiuru 21 + 2 Laps + 1 Lap 1 - 1:50.23 0 X X W
27 (-23) Kode 14 + 9 Laps† 0 DT (Speeding) 1:46.33 0 X X X M
28 (+4) hugabuga 11 + 12 Laps† 1 DT (Speeding) 1:49.85 0 X X X M
29 (+9) PLbartx 8 + 15 Laps† 1 - 1:50.01 0 X W
30 (+1) mini ^h83 8 + 15 Laps† 2 - 1:50.38 0 X W
31 (-3) /SRP/ Kamileon 6 + 17 Laps† 0 - 1:49.63 0 X X X M
32 (-31) 24 Ro8er Chen 5 + 18 Laps† 1 - 1:46.25 0 X X W
33 (-16) S1DUS*GáboR 4 + 19 Laps† 1 - 1:48.71 0 X X W
34 (-5) Iron|Doni 4 + 19 Laps† 0 - 1:49.44 0 X X W
35 (+1) yungtommyb 2 + 21 Laps† 1 - 1:53.22 0 X X M
36 (-6) ^hLewisHamilton^h 2 + 21 Laps† 0 - 1:55.62 0 X M
37 (±0) [MRc]Rabbit 1 + 22 Laps† 0 - 2:07.53 0 X X X M
38 (-25) 「マァ」Naga 0 + 23 Laps† 0 - 0.00 0 X X X W

Pitstops

Name Lap Work Time [s] Total
32 cars made 34 pitstops with a total time of 4:57.46
SEBAJOSE® 21 2_0_0 1.20 1.20
「マァ」Paulo 18 2_0_0 1.21 1.21
S1DUS*GáboR 2 2_0_0 1.21 1.21
24 Ro8er Chen 3 2_0_0 1.21 1.21
RG^^3Mandula 23 2_0_0 1.21 1.21
[MRc]KIG 23 2_0_0 1.21 1.21
/ATIAN'' 10 2_0_0 1.21 1.21
[MRc] EmreKaan 9 2_0_0 1.21 1.21
[GD] Kaes 2 2_0_0 1.21 1.21
[FFM]^^6Strutter 21 2_0_0 1.21 1.21
kurkku87 3 2_0_0 1.22 1.22
yungtommyb 3 2_0_0 1.24 1.24
221. Fantom 22 131074_0_0 1.27 1.27
EVR A. Araújo 11 2_0_0 1.33 1.33
Lukáš Jančík 7 2_0_0 1.40 1.40
Felipe S. 4 2_0_0 1.47 1.47
Kimi7 12 131074_0_0 2.69 2.69
[MRc] Zesty 2 522_15_0 7.21 7.21
Woupat 11 131594_15_0 7.28 7.28
[MRc] Ricky 12 131594_15_0 8.94 8.94
aarcijs 6 522_15_0 9.17 9.17
Kiuru 2 16642_0_0 14.68 14.68
Math_55 2 147462_0_0 14.80 14.80
PLbartx 9 131334_0_0 15.75 15.75
hugabuga 11 131342_12_0 17.10 17.10
Oruzak 7 782_15_0 19.88 19.88
Bumschnarsi 13 131854_15_0 20.43 20.43
[MRc] Talha 7 17166_15_0 25.89 25.89
BlackViper 4 33030_0_0 25.97 25.97
jj 4 33030_0_0 27.28 27.28
13.Rydzu 9 16646_0_0 19.78 27.65
19 522_15_0 7.87
mini ^h83 8 2_0_0 4.50 32.72
9 33030_0_0 28.22

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
yungtommyb 2:00.09 154.02 2 0.00
^hLewisHamilton^h 2:00.12 153.98 2 0.00
[MRc]Rabbit 2:07.53 145.03 1 0.00
Kode 1:47.64 171.83 14 0.91
/SRP/ Kamileon 1:53.61 162.80 6 3.38
PLbartx 1:54.50 161.53 8 4.37
[MRc]KIG 1:49.22 169.34 23 4.38
RG^^3Mandula 1:48.01 171.24 23 4.41
[FFM]^^6Strutter 1:48.22 170.91 23 4.41
/ATIAN'' 1:49.20 169.37 23 4.48
「マァ」Paulo 1:49.38 169.09 23 4.57
[GD] Kaes 1:48.19 170.96 23 4.58
[MRc] EmreKaan 1:48.51 170.44 23 4.72
221. Fantom 1:48.84 169.93 23 4.78
kurkku87 1:51.42 166.00 23 4.86
Kimi7 1:51.85 165.37 23 5.00
EVR A. Araújo 1:48.39 170.65 23 5.09
SEBAJOSE® 1:49.90 168.29 23 5.31
[MRc] Zesty 1:48.38 170.66 23 6.03
Lukáš Jančík 1:51.40 166.03 23 6.13
[MRc] Ricky 1:52.69 164.14 23 7.11
Woupat 1:51.03 166.58 23 7.20
aarcijs 1:52.52 164.38 23 7.66
Math_55 1:56.23 159.13 22 9.36
Bumschnarsi 1:53.85 162.45 22 9.41
[MRc] Talha 1:50.64 167.17 23 10.37
Kiuru 1:59.47 154.82 21 10.60
Felipe S. 1:53.91 162.37 22 11.06
S1DUS*GáboR 2:00.35 153.68 4 11.07
Oruzak 1:53.76 162.59 22 11.28
hugabuga 1:58.17 156.52 11 11.40
BlackViper 1:55.03 160.79 22 11.80
13.Rydzu 1:55.00 160.83 22 12.33
24 Ro8er Chen 2:00.49 153.50 5 13.15
jj 1:55.43 160.24 22 15.97
mini ^h83 2:06.31 146.43 8 21.57
Iron|Doni 3:15.61 94.55 4 1:45.14

Sector Times

Name Best Sector 1 Best Sector 2 Best Sector 3 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 1:45.42
[FFM]^^6Strutter 33.34 --- 23 37.68 0.11 23 34.56 0.05 23 1:45.58 --- 1:45.58 --- 23
[MRc] Zesty 33.40 0.06 20 37.57 --- 22 34.58 0.07 17 1:45.55 0.17 1:45.72 0.14 22
[GD] Kaes 33.34 --- 15 37.82 0.25 19 34.51 --- 13 1:45.67 0.17 1:45.84 0.26 11
EVR A. Araújo 33.49 0.15 16 37.76 0.19 19 34.62 0.11 22 1:45.87 0.08 1:45.95 0.37 22
RG^^3Mandula 33.53 0.19 18 37.77 0.20 18 34.61 0.10 20 1:45.91 0.05 1:45.96 0.38 20
221. Fantom 33.46 0.12 20 37.77 0.20 18 34.68 0.17 20 1:45.91 0.06 1:45.97 0.39 20
[MRc] EmreKaan 33.42 0.08 22 37.86 0.29 20 34.66 0.15 23 1:45.94 0.21 1:46.15 0.57 23
24 Ro8er Chen 33.55 0.21 6 37.76 0.19 2 34.60 0.09 4 1:45.91 0.34 1:46.25 0.67 4
「マァ」Paulo 33.47 0.13 23 37.90 0.33 23 34.76 0.25 20 1:46.13 0.15 1:46.28 0.70 23
Kode 33.61 0.27 15 37.73 0.16 14 34.89 0.38 14 1:46.23 0.10 1:46.33 0.75 14
[MRc] Talha 33.66 0.32 22 37.96 0.39 18 34.82 0.31 20 1:46.44 0.05 1:46.49 0.91 20
SEBAJOSE® 33.67 0.33 15 37.85 0.28 18 34.99 0.48 16 1:46.51 0.03 1:46.54 0.96 18
[MRc]KIG 33.50 0.16 22 37.79 0.22 22 34.92 0.41 16 1:46.21 0.37 1:46.58 1.00 19
/ATIAN'' 33.73 0.39 20 37.96 0.39 17 34.88 0.37 11 1:46.57 0.18 1:46.75 1.17 17
Woupat 33.81 0.47 8 38.15 0.58 8 35.09 0.58 3 1:47.05 0.01 1:47.06 1.48 8
Felipe S. 33.84 0.50 21 38.46 0.89 14 34.97 0.46 14 1:47.27 0.08 1:47.35 1.77 14
[MRc] Ricky 33.98 0.64 10 38.22 0.65 6 35.48 0.97 10 1:47.68 0.27 1:47.95 2.37 10
kurkku87 33.95 0.61 22 38.42 0.85 9 35.35 0.84 21 1:47.72 0.30 1:48.02 2.44 22
aarcijs 34.07 0.73 16 38.32 0.75 15 35.30 0.79 13 1:47.69 0.40 1:48.09 2.51 22
13.Rydzu 33.88 0.54 15 38.61 1.04 7 35.14 0.63 16 1:47.63 0.60 1:48.23 2.65 14
jj 34.20 0.86 22 38.36 0.79 18 35.42 0.91 5 1:47.98 0.28 1:48.26 2.68 18
Lukáš Jančík 34.09 0.75 14 38.46 0.89 5 35.43 0.92 21 1:47.98 0.34 1:48.32 2.74 15
Math_55 34.11 0.77 22 38.52 0.95 19 35.59 1.08 21 1:48.22 0.11 1:48.33 2.75 19
BlackViper 34.40 1.06 22 38.45 0.88 7 35.33 0.82 22 1:48.18 0.40 1:48.58 3.00 22
S1DUS*GáboR 34.10 0.76 3 38.40 0.83 2 35.36 0.85 2 1:47.86 0.85 1:48.71 3.13 3
Kimi7 34.34 1.00 10 38.52 0.95 10 35.61 1.10 2 1:48.47 0.35 1:48.82 3.24 10
Oruzak 34.11 0.77 10 38.49 0.92 8 35.48 0.97 3 1:48.08 0.74 1:48.82 3.24 11
Bumschnarsi 34.30 0.96 8 38.48 0.91 19 35.70 1.19 10 1:48.48 0.59 1:49.07 3.49 10
Iron|Doni 34.37 1.03 5 38.54 0.97 4 35.75 1.24 3 1:48.66 0.78 1:49.44 3.86 4
/SRP/ Kamileon 34.73 1.39 5 39.12 1.55 3 35.49 0.98 5 1:49.34 0.29 1:49.63 4.05 5
hugabuga 34.61 1.27 8 38.85 1.28 11 35.93 1.42 8 1:49.39 0.46 1:49.85 4.27 9
PLbartx 35.00 1.66 5 38.92 1.35 5 36.09 1.58 5 1:50.01 --- 1:50.01 4.43 5
Kiuru 34.48 1.14 17 38.87 1.30 14 35.65 1.14 10 1:49.00 1.23 1:50.23 4.65 9
mini ^h83 34.61 1.27 4 39.42 1.85 4 36.20 1.69 6 1:50.23 0.15 1:50.38 4.80 4
yungtommyb 34.08 0.74 2 38.38 0.81 2 35.90 1.39 1 1:48.36 4.86 1:53.22 7.64 2
^hLewisHamilton^h 34.85 1.51 2 39.43 1.86 2 35.88 1.37 1 1:50.16 5.46 1:55.62 10.04 2
[MRc]Rabbit 34.63 1.29 2 38.74 1.17 2 36.81 2.30 1 1:50.18 17.35 2:07.53 21.95 1

Flags

Name Yellows Caused Blues Seen
23 cars caused 88 yellow and 12 cars got 150 blue flags.
221. Fantom 3 0
[MRc]KIG 2 0
「マァ」Paulo 1 0
SEBAJOSE® 2 0
[MRc] Talha 1 0
Woupat 1 0
Lukáš Jančík 2 0
kurkku87 4 0
aarcijs 1 6
[MRc] Ricky 4 6
Oruzak 3 26
Bumschnarsi 1 15
Felipe S. 7 16
13.Rydzu 7 9
BlackViper 4 22
jj 6 5
Math_55 11 9
Kiuru 12 26
hugabuga 5 0
mini ^h83 5 5
S1DUS*GáboR 3 0
Iron|Doni 0 5
yungtommyb 1 0
^hLewisHamilton^h 2 0

Penalties

Name Lap Description
2 cars got a total of 3 penalties.
Kode 15 DT (Speeding)
hugabuga 11 DT (Speeding)
12 DT (Speeding)

Lap by Lap Analysis

Lap RG^^3Mandula [GD] Kaes [FFM]^^6Strutter [MRc] Zesty EVR A. Araújo [MRc] EmreKaan 221. Fantom /ATIAN'' [MRc]KIG 「マァ」Paulo SEBAJOSE® [MRc] Talha Woupat Lukáš Jančík kurkku87 Kimi7 aarcijs [MRc] Ricky Oruzak Bumschnarsi Felipe S. 13.Rydzu BlackViper jj Math_55 Kiuru Kode hugabuga PLbartx mini ^h83 /SRP/ Kamileon 24 Ro8er Chen S1DUS*GáboR Iron|Doni yungtommyb ^hLewisHamilton^h [MRc]Rabbit 「マァ」Naga
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 41:24.28 41:28.28 41:28.95 41:32.64 41:32.88 41:35.83 41:43.42 41:51.69 41:52.15 41:55.85 42:07.78 42:24.76 42:33.69 42:42.14 42:42.69 42:52.44 43:07.90 43:11.76 41:42.65 41:44.79 41:46.01 42:10.03 42:10.62 42:19.41 42:37.03 41:48.79 25:06.98 21:39.86 15:16.02 16:50.48 11:21.64 10:02.45 8:01.41 13:02.43 4:00.17 4:00.24 2:07.53 0.00
+ 4.00 + 4.67 + 8.36 + 8.60 + 11.55 + 19.14 + 27.41 + 27.87 + 31.57 + 43.50 + 1:00.48 + 1:09.41 + 1:17.86 + 1:18.41 + 1:28.16 + 1:43.62 + 1:47.48 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 9 Laps† + 12 Laps† + 15 Laps† + 15 Laps† + 17 Laps† + 18 Laps† + 19 Laps† + 19 Laps† + 21 Laps† + 21 Laps† + 22 Laps† + 23 Laps†
100%: 1:45.58 101%: 1:46.63 103%: 1:48.74 105%: 1:50.85 107%: 1:52.97 >107%: >1:52.97 Pitstop Takeover Penalty Lap Rejoin
1 1:55.37 2:06.58 1:57.39 2:04.55 1:57.95 1:56.41 1:58.66 1:59.76 1:59.82 2:09.75 2:07.99 1:59.81 2:01.83 2:02.30 2:12.37 2:03.78 2:01.91 2:25.28 2:03.20 2:09.82 2:03.13 2:03.90 2:11.40 2:10.76 2:27.09 3:55.48 1:57.54 2:07.54 2:07.93 2:09.81 2:07.88 2:31.23 2:07.55 7:33.13 2:06.95 2:04.62 2:07.53  
2 1:46.85 2:07.37 1:47.47 2:14.35 1:47.25 1:47.54 1:47.44 1:47.53 1:48.75 1:49.64 1:50.17 1:48.02 1:48.95 1:49.59 1:54.33 1:49.75 1:49.24 1:50.63 1:54.82 1:50.72 1:59.05 1:48.54 1:59.58 1:50.87 2:24.03 2:29.58 1:47.19 1:51.52 1:52.07 2:08.78 1:52.60 1:51.56 2:09.64 1:49.86 1:53.22 1:55.62    
3 1:46.78 1:46.93 1:47.88 1:47.06 1:47.10 1:46.96 1:47.37 1:48.19 1:47.62 1:47.81 1:47.50 1:47.62 1:47.65 1:48.79 2:10.22 1:49.33 1:48.63 1:50.21 1:49.05 1:50.60 2:35.37 1:49.08 2:13.44 2:39.63 1:51.71 1:51.63 1:47.12 1:59.34 1:50.72 1:53.73 1:50.71 2:06.90 1:48.71 1:50.00 Retired      
4 1:46.57 1:47.74 1:47.09 1:46.60 1:46.91 1:46.94 1:47.36 1:48.82 1:48.54 1:46.99 1:47.12 1:49.89 1:47.36 1:48.64 1:48.41 1:49.02 1:49.05 1:50.37 1:49.26 1:51.13 2:10.05 1:48.78 2:39.30 2:45.40 1:48.73 1:50.77 1:46.84 1:51.71 1:52.50 1:50.38 1:50.45 1:46.25 1:55.51 1:49.44        
5 1:47.04 1:46.19 1:46.46 1:47.91 1:46.63 1:47.23 1:47.20 1:47.63 1:47.79 1:48.36 1:48.12 1:49.13 1:49.03 1:49.20 1:52.98 1:51.16 1:58.33 1:48.53 1:49.48 1:49.83 1:48.74 1:48.64 1:53.95 1:48.83 1:49.46 1:51.32 1:46.82 1:52.11 1:50.01 1:51.95 1:49.63 1:46.51            
6 1:46.91 1:47.16 1:46.71 1:46.49 1:46.74 1:47.00 1:47.08 1:47.49 1:47.66 1:49.16 1:48.15 1:55.15 1:48.23 2:08.46 1:48.92 1:49.90 2:19.62 1:48.63 1:54.85 1:50.17 1:48.73 1:53.50 1:56.19 1:49.42 2:03.74 1:50.74 1:47.03 1:50.82 1:50.58 1:50.76 1:50.37              
7 1:46.78 1:46.28 1:47.22 1:46.62 1:46.88 1:47.40 1:46.90 1:48.52 1:48.08 1:47.37 1:47.23 2:35.75 1:47.60 2:10.70 1:49.54 1:48.88 1:49.54 1:48.32 2:41.19 1:50.40 1:50.46 1:48.40 1:49.03 1:51.23 1:49.90 1:50.53 1:47.33 2:00.25 1:51.12 2:15.95                
8 1:46.77 1:46.34 1:47.68 1:46.83 1:47.84 1:54.73 1:46.98 1:47.61 1:51.86 1:47.08 1:47.74 1:47.10 1:47.06 1:48.75 1:48.41 1:49.95 2:07.60 1:48.51 1:55.89 1:50.24 1:48.44 2:15.04 1:51.61 1:49.93 1:49.28 1:50.68 1:47.94 1:49.90 2:01.09 2:49.12                
9 1:46.69 1:46.40 1:47.38 1:46.62 1:46.96 2:07.75 1:46.84 1:53.29 1:47.81 1:47.34 1:47.52 1:47.96 1:47.78 1:48.65 1:48.17 1:50.20 1:48.61 1:48.03 1:49.08 1:49.21 1:49.03 2:28.49 1:48.84 1:52.36 1:58.69 1:50.23 1:46.87 1:49.85 Retired Retired                
10 1:46.56 1:46.28 1:46.53 1:46.32 1:51.98 1:46.74 1:46.70 2:07.77 1:47.56 1:46.92 1:47.78 1:51.89 2:08.58 1:52.16 1:48.62 1:48.82 1:48.59 1:47.95 1:49.41 1:49.07 1:49.35 1:49.15 1:49.17 1:49.50 1:57.48 1:50.69 1:46.50 1:59.54                    
11 1:46.68 1:45.84 1:46.35 1:46.68 2:09.91 1:47.77 1:47.13 1:46.94 1:47.74 1:47.33 1:47.03 1:47.51 2:16.08 1:48.95 1:48.91 1:55.51 1:48.98 1:53.86 1:48.82 1:49.34 1:50.10 1:48.49 1:53.53 1:49.24 1:50.96 1:51.72 1:46.60 2:27.28                    
12 1:46.45 1:46.53 1:46.43 1:46.26 1:46.43 1:47.24 1:46.65 1:47.06 1:47.27 1:47.37 1:46.86 1:47.66 1:48.42 1:48.57 1:48.51 2:12.71 1:48.87 2:18.56 1:49.20 1:57.58 1:52.85 1:48.24 1:49.64 1:51.46 1:52.91 1:51.40 1:46.49                      
13 1:46.26 1:45.95 1:46.36 1:46.06 1:46.34 1:46.75 1:46.74 1:47.22 1:46.96 1:47.01 1:47.40 1:47.36 1:48.21 1:49.08 1:48.55 1:50.33 1:48.75 1:48.87 1:50.71 2:32.84 2:00.04 1:49.36 1:48.99 1:49.29 1:55.94 1:50.86 1:46.38                      
14 1:46.71 1:46.06 1:46.72 1:46.17 1:46.26 1:46.50 1:46.41 1:47.31 1:47.48 1:46.98 1:47.14 1:47.29 1:49.08 1:48.92 1:52.98 1:50.63 1:56.40 2:03.51 1:57.71 1:51.36 1:47.35 1:48.23 1:51.02 1:49.11 1:58.76 1:50.26 1:46.33                      
15 1:46.55 1:46.99 1:46.78 1:46.11 1:46.16 1:46.40 1:55.10 1:47.41 1:47.41 1:46.81 1:46.98 1:47.90 1:49.85 1:48.32 1:48.97 1:49.61 1:48.41 1:48.84 1:49.15 1:51.57 1:47.85 1:49.11 1:49.54 1:49.12 1:48.87 1:59.65                        
16 1:46.35 1:46.02 1:46.52 1:45.93 1:46.11 1:46.38 1:47.48 1:47.87 1:46.59 1:47.18 1:47.06 1:47.05 1:47.80 1:48.76 1:48.56 1:50.60 1:51.33 1:49.84 1:49.62 1:49.93 1:53.25 1:48.46 1:49.52 1:49.82 1:49.42 1:51.00                        
17 1:46.20 1:46.01 1:46.07 1:45.74 1:46.24 1:46.54 1:46.36 1:46.75 1:47.00 1:52.25 1:46.73 1:46.63 1:48.10 1:48.71 1:48.46 1:49.62 1:48.21 1:48.28 1:51.12 1:51.31 1:49.21 1:49.27 1:49.92 1:49.16 1:50.29 1:50.24                        
18 1:46.06 1:46.54 1:46.34 1:45.95 1:46.41 1:46.66 1:46.29 1:46.99 1:46.65 2:07.56 1:46.54 1:46.60 1:48.18 1:48.59 1:51.63 1:50.61 1:51.46 1:48.67 1:49.46 1:51.10 1:48.93 2:06.30 1:50.77 1:48.26 1:49.41 1:51.04                        
19 1:46.22 1:45.85 1:45.91 1:45.94 1:46.02 1:46.57 1:46.44 1:47.90 1:46.58 1:46.92 1:46.97 1:47.78 1:48.03 1:49.59 1:48.66 1:49.36 1:49.46 1:49.14 1:50.42 1:50.58 1:48.49 2:22.58 1:49.02 1:48.85 1:48.33 1:52.81                        
20 1:45.96 1:46.21 1:51.29 1:46.02 1:46.47 1:46.28 1:45.97 1:47.06 1:47.11 1:46.47 1:52.30 1:46.49 1:48.97 1:49.46 1:50.25 1:50.08 1:49.06 1:49.13 1:49.48 1:57.38 1:48.71 1:48.88 1:48.65 1:49.47 1:49.05 1:56.63                        
21 1:46.05 1:46.31 2:06.76 1:46.20 1:46.16 1:47.68 1:51.95 1:47.28 1:46.76 1:46.92 2:10.26 1:46.71 1:48.39 1:48.53 1:48.48 1:50.49 1:49.08 1:48.60 1:50.17 1:50.46 1:49.46 1:48.41 1:48.93 1:49.33 1:49.09 1:51.53                        
22 1:51.82 1:46.16 1:46.03 1:45.72 1:45.95 1:46.21 2:07.60 1:47.63 1:51.99 1:46.35 1:46.82 1:46.56 1:48.68 1:48.47 1:48.02 1:51.15 1:48.09 1:48.47 1:50.56 1:50.15 1:47.42 1:49.18 1:48.58 1:48.37 2:13.89                          
23 2:06.65 1:46.54 1:45.58 1:46.51 1:48.18 1:46.15 1:46.77 1:47.66 2:07.12 1:46.28 1:56.37 1:46.90 1:49.83 1:48.95 1:48.74 1:50.95 1:48.68 1:49.53                                        

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)